ML19256C858

From kanterella
Jump to navigation Jump to search
PNO-79-324:leakage Into Drywell Noted on 790809.Plant Began to Shut Down as Leakage Rate Topped 4 Gallons Per Minute & Is Expected to Be Completed by 1:00 Am on 790810
ML19256C858
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/09/1979
From: Bryan S, Mckee P, Nolan F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-79-324, NUDOCS 7910150354
Download: ML19256C858 (1)


Text

-

~

[d PRELIMINARY NOTIFICATION

. August 9,1979 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-79-324 This oreliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest sionificance.

The information presented is as initially received without verification or evaluation and is basically all tnat is known by IE staff on this date.

Facility:

Vermont Yankee Nuclear Power Corporation Vermont Yankee (DN 50-271)

Subject:

UNSCHEDULED SHUTDOWN An increase in leakage into the drywell was noted on August 9, 1979.

By 7:30 a.m. the leak rate was approximately 4 gpm.

A drywell entry was made at approximately 10:00 a.m. at.which time wet piping insulation was noted in the general area of the "A" recirculation loop discharge valve.

The licensee com-menced a plant shutdown at 12:00 noon to investigate and repair the source of this leakage (The Technical Specifications require a plant shutdown to cold shutdown conditions within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if leakage into the drywell from unidentified sources exceeds 5 gpm).

Cold shutdown is expected by 1:00 a.m. on August 10, 1979.

Media interest is expected because of sensitivity to nuclear plant issues.

The State of Vermont has been informed.

A press release is planned by the licensee.

NRC, Region I, (Philadelphia) received notification of this occurrence by telephone from the plant superintendent at 11:22 a.m. on August 9,1979.

Centact:

PMcKee, IE x28019 F. Nolan, IE x28019 S Bryan, IE x28019 Distribution:

Transmitted H St Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky ACRS (For Distribution)

Transmitted:

MNBB P. Bldg 3: 2y V. Stello, IE L. V. Gossick, EDO H. R. Denton, NRR Region 2 H.

L. Ornstein, E00 R. C. DeYoung, NRR J. J. Fcuchard, PA R. J. Mattson, NRR N. M. Haller, MPA D. Vassallo, NRR (MAIL)

R. G. Ryan, OSP D. Eisenhut, NRR J. J. Cummings, 01A H

K. Shapar, ELD SS Bldg R. Minogue, SD W. J. Dircks, NMSS S. Levine, RES PRELIMINARY NOTIFICATION 7010150 ] fy J

.