.a.b PRELIMINARY NOTIFICATION January 16, 1979 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-79-07 c
This preliminary notification constitutes EARLY notice of event of POSSIBLE safety or public interest significance.
The information presented 1s as initially received without verification or evaluation and is basically all that is known by IE staff on this date.
Facility:
Toledo Edison Company Davis-Besse, Unit 1 Port Clinton, Ohio (DN 50-346)
Subject:
UNPLANNED REACTOR SHUTDOWN The licensee informed RIII that following the completion of the 100%
load rejection test on January 15, 1979, they initiated plant cooldown operations in order to replace a failing reactor coolant pump shaft seal.
The outage is currently scheduled to last two weeks.
The licensee issued a press release concerning the outage and the power ascension testing performed this past weekend.
The State of Ohio has been informed.
RIII (Chicago) received notification of this matter by telephone from the licensee late on January 15, 1979.
Contact:
FNolan, IE x28019 PMcKee, IE x28019 Distribution-Transmitted H St [ 6 6 Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissior.ec Gilinsky (For Distribution)
' h b P. Bldg h O O J. G. Davis, IE Transmitted: MNBB T
M O.C~
L. V. Gossick, EDO H. R. Denton, NRR Region H. L. Ornstein, EDO R. C. DeYoung, NRR J. J. Fouchard, PA R. J. Mattson, NRR N. M. Haller, MPA V. Stello, NRR (MAIL)
R. G. Ryan, OSP R. S. Boyd, NRR J. J. Cummings, 0IA H. K. Shapar, ELD SS Bldg '2 02 R. Minogue, SD W. J. Dircks, NMSS PRELIMINARY NOTIFICATION 1448 559 E
7910120h0(
.