ML19256B824
| ML19256B824 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/09/1978 |
| From: | Fulcher J, Pletke L, Wilson W BABCOCK & WILCOX CO. |
| To: | |
| References | |
| TASK-TF, TASK-TMR 193, PROB-781009, NUDOCS 7909140345 | |
| Download: ML19256B824 (1) | |
Text
QL.._.........
.-." '. : ~ ~~~'~~~. *~L._
.. ~. T - ~........ - --........: = - : ~.
BWNP-20344-1(8-78)
D SITE PROBLEM REPORT RESOLUTION TRANSMITTAL File; 13-oG - 193 Change Control
_For Distribution S. H. K1ein For Information Contract No.:
520-00 o c.
'SPR Number:
N3 kco O
- 8. A. Karrasch For Information AC. cwMd (RTB)
Title:
L. C.. fceges For Action 3.th. 6 L p luv b All Affected Task Engineers L. cop A w
L..R. 9 b ( b c For Information h.h.C.e do ne s All Affected Engineering Status Code: M Unit Managers Date Of Transmittal: /o//2/M O.onRequested:
L. c. Esecs is,ec<,es <c) 4 %n ele ada es i
g M
b-0 Reply and Return This Transmittal to:
Nuclear Service Support Engineer CC:
J. R. Bohart - International Support P. E. Perrone- 0FR L. C. Rogers - TMI Site 1916 235 O
=;..
PDS-21091 -5 ( 8 -7 6 )
i SITE PROBLEM REPORT
/?
BABCOCK & WILCOX
.e x:.;_.<
--ewe,-,:r m r
..--=.-r=12 :,r2m:: - nm.c.m.m.em pAiE 00C.ID. CONF.No.
SPR h0.
R E v. H U.
R Cu 5 T0",E R ORIGlMpt fp7/78 13 620-Coc6 193 0
e Jersey Central L. Ronti e PANI NO./IASK N0 GROUP t.0.
SEQ. HJ.
O P.A.
NO.
VEH00R PAV - BCCo PROBLEH CONTACT fpj TITLE (HAX 30 CHARACTERS)
R. Tatorre A s RC Outiet (RTU) Loco A
-- :::.=
DESCRIPTION OF PROBLEH:
Loop A hot leg temperature RTD (RC 14A-TE2), which is used in t. e RFS, of the had drifting temperature indications versus the stable readin(;t re aining RTD 's in Loop A D
-r*
~_
m
~%
-e 5
STATUS-ACTION TO DATE, INCLUDietG PERSONS CONTACTED:
Signals from this two-element sensor (the other being used for I!!!I)
E Concurrenc e were switched to provide the RPS with a reliable signal.
for this action was obtained from K. Wandling and L. McBee.
FURTHER ACTION RECOMMENDED BY SITE PERSONNEL:
This action Replace the RTD with a spare RTD during the next outace.
concurred by R. Vosburgh.
- ~.:=..
[
fg g
f RESOLUTION:
4 g
[se *, (C ykq I?."T b )
E DATE DATE APPROVED BY B
A PREPAR(UD LL-mM/vn E
5t 5 D NS W &w %%
"NNr bob %N
' Ifl75 COST CAIECORY FIELD CHANGE REQ F.C. A. NO.
SIGHlf. DEFICIENCY g
////
, OYES NO NORH OTHER O OYES NO 6 og-DEVI All0NS:
SITE ConPLLil0M REPORI:
O FONE SPR REV NO. [~)
DATE CCHPLETED:
COMPLETED BY DATE O
E 1916 236 a
U