Site Problem Rept 166 Re Seal Return Line Pressure Causing Erratic Seal Staging of Reactor Coolant Pumps.Lower &/Or Middle Seals May Destage.Caused by Recirculation Line from Mu Pump Entering Seal Return Loop
ML19256B821
Person / Time
Site: Crane 
Issue date: 04/05/1978
From: Pletke L, Rise D, Rogers L
BABCOCK & WILCOX CO.
To:
References
TASK-TF, TASK-TMR 166, PROB-780405, NUDOCS 7909140280
Download: ML19256B821 (2)


Text

__

O O-SITE PROBLEM REPORT TRANSMITTAL

        • CLEARED ****

To:

Change Control For Distribution File:

13-4 -/4 4 S. H. Klein - Ouality Assurance Contract No.:

620-0004, Central Engineering Files SPR:

/66

7. p. Afme*Jf y Task Engineer (s)

Title:

f. m

,e4e

,cr-e u erfu

/. A'. o4 s rxF - Project Manager espex (NPEs s a d E Date:

Y-/ ? -2 8 Status Code:

C L. C. Rogers - MET. ED.

P.E;Penowe F. R. Faist - TOLEDO J. R. Bohart - Intl. Support B. A. Karrasch - Plant Integration Attached is one copy of Site Problem Report No.

/44 which was processed on Contract 620-00 6/,

Future contracts have been reviewed for the potential of a similar problem. This problem isfis not considered applicable to other contracts REMARKS:

/i- -K~

NUbEAR SERVICE SUPPORT ENGINEER 7909140960 1916'248 e,

?

F @3 :, a l 3

i J,

bd % Y a

p SITE PRCBLEM REF..,'T c.BA(JCK&WILC,OX s,

e

--- m,).,

. -.wmm.,_, _,, _

u sn.=. tsuzans-xs CUSiCHon OstbihAIO.f.yAir D0C. I D.

COMI.h0.

SPR no.

k L s. N O.'

Jersey Central L. Ror era-' TI/hlh'T 13 - 620-CCC6 166 o

VEND 0R P.A.

NO.

PART NO./iASK kO.

GROUP M0.

SEQ. m0.

Babcock & h*ilcox 8/ "2.

og gg D. Corbin A/.u.(/ L

/ p

//

PROBLEH CONTACT TITLE (HA4 30 CHARACTERS) tU MU Seal Re';u' n Bac'<. Pres sure W.

DESCRIPil0h 0F PROBLEM:

During EFT various RC pump parameters were tonitered to assure that the punps were operating within the design limits ascribed to

  • hen.

The seal return line pressure was found to be in the range of 50-60 pounds, as measured at the rotameters.

This pressure was caused by the recirculation line from the 5

MU pump entering the seal return loop. This pressure has caused the seal j

staging of the RC pumps to becone erratic.

Specifically, the lower and/or middle seals may destage.

u

~

3 STATUS-ACTION TO DATE. INCLUDidG PE*. SONS CONTACTED:

E To date, John Dempsey and I have been =onitoring this parameter to determine its effect on the seals.

FURTHER ACTION RECOMMENDED BY SITE PERSONNEL:

RESOLUTION:

$fd pE 6//8F W if r e n bffCIF/E $

R e t*

5 St9 L Ot9C M fff *M E L-tm s T.

1916 249" b

PREPARE-BY DATE APPROVED BY DATE h

f5 Y-//~ 79

, f,

\\

./, N, Xt l-W l

COST CATEGORY flELD CHANGE REQ F.C.A. NO.

SIGNIF. DEFICIENCY NORM OTHER OYES NO 8 0 '4-OYES MO M DE)iATIONS:

StIE COMPLtItON

' '.b'R T :

8 NONE SPR REV NO. O

- '9 g,g,rgo er, y,, _ g., j gy s s-p x?7sc NBp SM

.O - J.3.,2 7 >> c DATE COMPLETED:

z Y~4~U9

.n.s.eian parr p s e K / J-C.S S W (

Me cw3Le C0HPLETED Bys DATE ic 2 #9 s s c, rA s _c s.s m i r s s. e o e.

(g/*. j/ '

<w D d 4? 7O 9 4 d-4~~ 4 f '7 * <*. 2.d."c f +.ee dfd2 AT

'a J'.%

?/

/ /

3 o

s-i?

i* e.<x 4 ? 7 s c Mc' a p :. a.? t s'->,,.e e p.,,a 7 2 c W o.

suffi

/

Or

SPR 166 f

e FURTHER ACTION RECO:0!E:IDED BY SITE PERSO:INEL Please review the B&W ICJ Syste design and reco==end a solution to this problem.

Please investigate at least the following area's:

1.

Is the 60 pound discharge pressure of the MU recire orifice acceptable from the MU System operation standpoint?

2.

By leaving the piping arrangement as is, the potential for nor=al operation with destaged seals still exists.

Is this acceptable as a normal code of operation?

Investigate with respect to RC transient analysis and normal operation.

3.

Could the Ifd System handle the additional heat load of piping the seal returns directly to the IG tank? What other piping codifications would you recoc=end?

14 Does the potentici for this problem exist on all B&W plants?

O L.

e 4

o L916 250 2x