Forwards IE Circular 79-08, Attempted Extortion - Low Enriched U
ML19256B307
Person / Time
Site: 07000754, 07001007
Issue date: 05/18/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Darmitzel R
GENERAL ELECTRIC CO.
References
NUDOCS 7906080222
Download: ML19256B307 (1)


Text

l 0

4 UNITED STATES 4

c i

'4 WUCLEAR REGULATORY COMMisslON

[ w /.1[o. $

...k.,7 nEcion v S [kdN SUITE 202. W ALNUT C REEK PLAZA

.O 1990 N. C ALIFO R NI A BOULEV A R D 9 ***e*

W ALNUT C REEK. CALIFORNI A 94596 May 18, 1979 i

a 1.1

'A

~

Docket Nos.70-754 70-1007 General Electric Company Vallecitos Nuclear Center Vallecitos Road Pleasanton, California 94565 Attention: Mr. R. W. Darmitzel, Manager Irradiation Processing Operation Gentlemen:

The enclosed IE Circular 79-08 is forwarded to you for information.

If there are any questions related to the contents or intent of the Circular or its attachments, please contact this office.

Sincerely, 4

s y

/

/

l

/

dh?LC ngelken [W /

L PJ D rector S

Enclosure:

%~

IE Circular No. 79-08

'l w/ attachments

)

a 7906080 W "f:%

u..,e<.

UtlITED STATES NUCLEAR REGULATORY COP 111SSION 0FFICE OF INSPECTION AND ErlFORCEMENT WASHINGTON, D.C.

20555 May 18, 1979 IE Circular flo. 79-08 ATTEMPTED EXTORTION - LOW ENRICHED URANIUM

Background

In January 1979, a temporary contractor employee who was working at the General Electric plant in Wilmington, North Carolina, allegedly entered the plant and removed a drum containing two 5-gallon cans of low enriched uranium fror the facility with the intention of extorting money for the return of the material.

The Federal Bureau of Investigation conducted an intensive investigation leading to the arrest of the employee on February 1, 1979. All material was recovered and returned to the plant.

Discussion Based on preliminary information provided the NRC, the thef t was allegedly carried out in the following manner:

On Friday, January 26, 1979, the subject worked the day shift.

At 10:50 p.m. the same day he drove back to the plant and entered with the night shift. He showed his Florida driver's license at the entrance gate instead of his yellow contractor badge because it had a blue background similar to that on the picture badge which he thought was required to gain access to the area of the plant that he wanted to penetrate.

He had allegedly gained access using his driver's license on previous occasions.

Once inside the plant, the subject would have been guided by gates and fences into a parking area had it not been for the fact that one gate had been removed to allow installation of truck scales.

He proceeded down the unprotected road to an area adjacent to the building he wanted to enter.

Af ter the subject entered the building through a personnel door, he proceeded to his normal working station which was the Chem Tech Lab and entered, using his own key.

In the lab he picked up his protective clothing, a two wheel cart used to move 55-gallon drums and a container used to ship chemicals.

The He then proceeded to a door DUPLICATE DOCUMENT Entire document previously entered into system under: