ML19256B216
| ML19256B216 | |
| Person / Time | |
|---|---|
| Issue date: | 12/27/1978 |
| From: | Glagola A NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | |
| Shared Package | |
| ML19256B217 | List: |
| References | |
| CON-NRC-03-78-150, CON-NRC-03-78-150-TASK-2, CON-NRC-3-78-150, CON-NRC-3-78-150-TASK-2 NUDOCS 7901260020 | |
| Download: ML19256B216 (1) | |
Text
.--
CONTR ACT NUMBER U
NRC 'f oRM 255 (10 76)
HRC-03-75-150 Task II DIVISION OF CON TR ACTS MODIFICATION NUMBER U.S NUCLE AR REGULATORY CGMMISSION W ASHINGTON, D.C.
20555
[]NEW
{l MODIFICATION OTHE R (Spect/v/
NOTIFICATION OF CONTRACT EXECUTION CONTRACT BASED ON.
TO:
P49er htts0_02 Director AUTHORIZATION NUMBER I Totte)
Division of Systets Safety, DRR DAre 10nianuation)
FROM: /L F. Glegola 1/rng (Contact Svecrat sti loate.)
i F. Schauer replaces I. S1hwell lecimicallssistance_centrects Pre'ch DivlSION OF CONTRACTS, ADM CON T R ACTOR INanm & L ocat on/
EXECUTION DATE
%athan H. ficizark tecerb::r 27,197E Cotisulting Engineering Services TYPE OF CONTR ACT 1211 Civil Engineering Building Urbana. IL GlE01 Tire and fiatorial PROJECT TIT LE PERIOD OF PERFORMANCE Evaluations of $eismic Design bases and E/16/78 - 9/30/79 Analyses Pertaining to Diablo Canyon PRINCIPAL INVESTIG ATOR
?iathan !!cwark NRC AUTHORIZED REPRESENTATIVE F. Schauer G&R NUMBE R FIN NUMBER li/A
- /A AMOUNT NEW NRC FUNDS S 0-FUNDING TOTAL FYk_ FUNDING Sl3.000.00 TOTAL NRC OBLIGATIONS S30,0CO.00 GOVE RNMENT PROPERTY A T TACHMEN T(S)
CONTR ACT DOCdME N T 1
)
IO'E""""
790126002.0
'