,* SS

/'/M._N'\ C0110!!m0fG l I 90','!0f

( \'

h. uM g g* Stephen H. Howell g$ Senior Vice President General O f fices: 194G West Parnall Road, Jackson, Michigan 49201 . (5171 788 4453 January 12, 1979 Howe-ll-79 Mr J G Keppler, Re61 onal Director Office of In:;pection and Enforcement Region III U3 Huclear Regulatory Comnission

'(99 Roosevelt Rccd Glen Ellyn, IL 60137 MIDIPID UUCLEAR PLANT -

UNIT T 1, DOCKET no 50-329 UNIT KO 2, DOCKET UD 50-330 SMALL ERE/iK AHf LYSIS i

Reference:

S H Hot ell tters to J G reppler; Midland Nuclear Plant; Unit No 1, Docket no 50-329; Unit No 2, Docket No 50-330; Small Breek Analysis -

1) Serial Howe-74-78; dated May 12, 1978
2) Serial Houe-12h-78; dated July 18, 1978
3) Serial Howe-182-78; dated September 29, 1978 The referenced letters were interin 50 55(e) reports as is this letter.

The HPI cross-connect modification, described in References 2 and 3, will be implemented.

P&ID's M h03 and h 40h have been reviced to incorporate the cross-connect and are currently in drawing distribution. Isometric drawings have been drafted, and preliminary stress analysis has been completed for the Unit 1 piping. These isometrics have been T,ransmitted to and approved by FIN as acceptable routings. Because the Unit 2 piping is identical, no additional engineering is required other than the preparation of the isometrics issued for fabrication. It is expected this vill be complete by early February,1979, at uhich time material procurement vill C om :'. enc e .

7 90 1 I?O 155 f

E J

4' llowe-ll '(9 -

Another report, either interim or final, will be submitted on or before March 12,19'(9 A i % - ysu -A (

lh{

CC: Director, Office of Inspection & Enforcement Att: Mr John G Davic, Acting Director, US I!RC (15) jirector,OfficeofManagement Information and Program Control, US IIRC (1)