ML19256A271

From kanterella
Jump to navigation Jump to search
Forwards Drawing NPM-SJ-1703,Rev 1 Which Was Not Incl in 780911 Amend Appl.Drawing Reflects Changes to Ventilation Sys as a Result of Constr of Pellet Shop Annex & Addition of FA-4 Ventilation Sys.W/Encl Oversize Drawings
ML19256A271
Person / Time
Site: 07001100
Issue date: 11/03/1978
From: Lichtenberger
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 7811280011
Download: ML19256A271 (101)


Text

C-E Power Systems Tel. 203/688-1911 Cornbustion EngMeenng. Inc.

Telex: 99297 1000 Prospect Hill Roac Windsor, Connecticut 06095 d'3 POWER uma SYSTEMS q 09

^.:2 SNM License 1067 j.

November 3, 1978

~

",,, Docket 70-1100 U. S. Nuclear Regulatory Comi Washington, D. C.

20555 Attention:

Mr. L. C. Rouse, Chief Fue'. Processing & Fabrication Branch Division of Fuel Cycle & Material Safety

Reference:

Amendment Application - Letter from H. V. Lichtenberger to L. C. Rouse, dated September 11, 1978 Gentlemen:

In our amendment application referenced above, we referred to Drawing NPM-SJ-1703, Rev.1 which was not included in our submittal.

This drawing reflects changes to our ventilation system as a result of the construction of the Pellet Shop Annex and addition of the FA-4 venti-lation system.

Figure E-1, " Fuel Fabrication Plant Criticality Layout" has also been recently revised as Drawing NFM-0-J2454, Rev. O.

These two drawings are hereby submitted to provide sufficient information nec-essary for your review of our referenced amendment application.

Very truly yours, ll abt W

H. V. Lichtenberger Vice President-Nuclear Fuel Nuclear Power Systems-Manufacturing HVL/GJB/ssb 3

h{

.,,5D

Enclosures:

1)' Drawing #NPM-SJ-1703, Rev. 1

2) Drawing #NFit-0-J2454, Re'.'.

O i]

34 n..

OC C.h.

k.,

x.:,;.

s '. Z

  • eue e

% s y 4