... 4. h/

BOSTON CDISDN COMPANY GENERAC orricts GOD BovLaTON STREET SosTON, MAssACNusETTs 02199 G. CAmL ANQQGNIN8 suPEntNTEMOENT NUCLEAm QPERATIONs DEPARTMENT October 15, 1979 BECo. Ltr. #79-201 Mr. Boyce H. Grier Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia,1-A 19406 License No. DPR-35 Docket No. 50-293 Anchor Bolt Inspection Per IE Bulletin 79-02 Ref. a.) Boston Edison Compaay letter to Boyce H.

Grier, titled " Response to IE Bulletin No. 79-02, Rev. 1, Pipe Support Base Plate Designs Using Concrete Erpansion Anchor Bolts", dated July 9, 1979.

Ref. b.) NRC Letter to Boston Edison Companj titled, "IE Bulletin 79-02, Revision #1",

dated June 21, 1979.

Dear Sir:

In Ref. a), Boston Edison Company stipulated that inspections of all seismic Category I base plates would be completed by February 28, 1980.

On August 30, 1979, Mr. Ralph Architzel of your office contacted Boston Edison via telephone and requested that we re-structure our inspection schedule, to reflect a completion cf inspections on accessible

  • anchor bolts by November 15, 1979.

In a subsequent IE Inspection by Mr. Architzel, on our procedures for anchor bolt inspection, it was pointed out that our method of testing "wej-it" types should be expanded to include the scope as delineated in Reference b.).

Please be advised that our inspection schedule for accessible anchor bolts, with the exception of "wej-it" types, has been revised and we will make every effort to complete these inspections by November 15, 1979. More time is needed to complete inspections of the "wej-it" types, due to the increase in scope per Reference b.). Should any unforeseen circumstances prevent us from completing inspections on all other accessible anchor bolt types per this new schedule we shall notify you accordingly.

g' 7911120 "l

  • Accessibility to be determined by Boston Edison 1 0 .555

I J.

SOSTON ELISON COMPANY Mr. Boyce H. Grier October 15, 1979 Page 2 If there are any questions on this subject, please contact us.

Very truly yours, AM./ AW:~.

'/ /

1310 356 cc: United States Nuclear Regulatory Comission Office of Inspection and Enforcement Division of Reactor Operation Inspection Washington, D. C. 20555