ML19254F257

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Inoperability of Asco Solenoid Valves When Exposed to Radiation Dosage & Temps Specified in Purchase Requirements
Date released: 09/25/2019 Download: ML19254F257


Interim Deficiency Rept Re Asco Solenoid Valves.Design Does Not Conform to Design Criteria in Purchase Spec.Final Rept Will Be Filed by 791221
ML19254F258
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/11/1979
From:
MISSISSIPPI POWER & LIGHT CO.
To:
References
Download: ML19254F258 (2)
Forwards Interim Deficiency Rept Re Inoperability of Asco Solenoid Valves When Exposed to Radiation Dosage & Temps Specified in Purchase Requirements
ML19254F256
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/11/1979
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254F256 (1)