Text
. dL -
s L.OUISIANA j ida osanaNos stocar POWER & L1GHT/ p o. sox socs. NEW anLEANS. LaulSIANA 70174 (5C4) 366-2345 EIN dYS October 31, 1979 a iswaA SCS h54emt-Net
- MGuCL0n LPL 12319 Q-3-A35.07.06 3-A1.01.04 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
SUBJECT:
Waterford SES - Unit No. 3 Docket No. 50-382 Status of Significant Construction Deficiencies No. 6
" Emergency Diesel Generators-Defective Shaf ts & Springs" No.10
" Defective Emergency Generator Roller Pin"
REFERENCE:
a) LP&L Letter, LPL 10343 dated December 29, 1978 b) LP&L Letter, LPL 10233 dated Dece=ber 5, 1978 As Amended by LPL 10316 dated Dece=ber 19, 1978 As A=snded by LPL 11903 dated August 31, 1979
Dear Mr. Seyfrit:
In accordance with the requirements of 10CFR50.55(e), LP&L has previously submitted interim reports of the two Significant Construction Deficiencies concerning the emergency diesel generators.
Based on communications with Cooper-Bessemer, the manufacturer of the diesel generators, LP&L reported in the referenced letters that modifications correcting the deficiencies were scheduled to be completed and final reports submitted by November 1,1979.
Cooper-Bessemer has informed us that the modification assemblies were rejected and reordered. New modification assemblies for the defective emergency gener-ator roller pins are now scheduled to la shipped by November 15, 1979.
This delay by Cooper-Bessemer still does not adversely impact Waterford 3 construc-tion needs and is acceptable.
Based on the above, in addition to adding adequate time for inspection and installation activities, we will now submit final reports for Significant Construction Deficiencies No. 6 and No.10 by March 15, 1980.
Aho
"2 201 7911070
..w*
Mr. K. V. Seyfrit Your:2 very truly, D. L. Aswell DD/TFG/grf cc:
- 1) Director Office cf Inspection & Enforcement U. S. Nuclear Regulatory Comission Washington, D.C.
20555 (15 copies)
- 2) Director Office of Manager.ent Infe mation and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 (1 copy) l"2 202
.