Summary of 791012 Meeting W/Util in Bethesda,Md Re Multiple Control Rod Removal
ML19254F125
Person / Time
Site: Pilgrim
Issue date: 10/16/1979
From: Hannon J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7911070076
Download: ML19254F125 (3)


Text

'

a O

f UNITED STATES 3%

NUCLEAR REGULATORY COMMISSION

$ j, %)f j WASHINGTON, D. C. 0555

.,,V.g/

s

'%.~ "...

October 16, 1979 Docket No. 50-293 LICENSEE: Bouton Edison Company FACILITY: Pilgrim Nuclear Power Station

SUBJECT:

MEETING

SUMMARY

A meeting was held with representatives from Boston Edison Company (BECo) in Bethesda, Maryland on October 12, 1979. The purpose of this meeting was to hear BECo's proposal for multiple control rod removal during refueling operations at Pilgrim Nuclear Power Station (PNPS-1). A list of meeting attendees is attached.

BECo presented calculations that had been performed to show that removal of more than one controlled cell (four fuel assemblies plus control rod) at a time from PNPS-1 will not violate the shutdown margin requirements.

The methodology for these calculations involved a first time synthesis of lattice and diffusion computer programs.

Benchmark calculations were performed for uniform water-moderated lattices and PNPS-1 80C-4.

Reactivity calculations were made for up to 16 controlled cells (approximately 11% of fuel) removed for PHPS-1 BOC 5.

Reactivity increases were not predicted for any of the cases studied.

The staff and consultants made several comments during the presentation, all of which BECo agreed to consider before making their Technical Specification change submittal.

Discussion topics included:

- techniques to improve analysis results

- error analysis

- temperature sensitivity studies

- scope of case sample size 1290 333

2-BECo expects to apply for a license amendment by the end of October, 1979. The Technical Specification change is intended to be applicable for all future refueling operations.

/9 ),L,s /r., W - %

/JohnN.Hannon,ProjectManager Operating Reactors Branch #3 Division of Operating Reactors

Enclosure:

Attendees 1290 334

Enclosure MEETING WITH BOSTON EDISON COMPANY OCTOBER 12, 1979 BECo P. Antonopoulos J. Seery J. Keyes BNL D. Cokinos SAI Chicago C. Tzacos NRC J. Hannon R. Bottimore H. Vanaerflolen 1290 335

.