Summary of 791023 Meeting W/Util in Bethesda,Md Re Status Review of Equipment Dynamic Qualification & re-evaluation Program of NSSS Equipment for Seismic & Hydrodynamic Loads
ML19254F061
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/24/1979
From: Hou S
Office of Nuclear Reactor Regulation
To: Bosnak R
Office of Nuclear Reactor Regulation
References
NUDOCS 7911050534
Download: ML19254F061 (35)


Text

Yh0 MEETING

SUMMARY

DISTRIBUTION Docket File J. Knight NRC PDR S. Hanauer Local PDR R. Tedesco TIC R. Bosnak NRR Reading S. Pawlicki LWR #3 File F. Schauer H. Denten K. Kniel E. Case T. Novak H. Berkow Z. Roxztoczy D. Ross W. Butler D. Vassal,lo V. Benaroya D. Skovholt R. Satterfield J. Stolz V. Moore R. Baer W. Kreger

0. Parr M. Ernst L. Rubenstein F. Rosa S. Varga R. Denise C. Heltemes EP Branch Chief W. Haass G. Chipman R. Houston J. Collins L. Crocker T. Murphy B. Kirschner G. Lerr F. Williams B. Youngblood R. Mattson R. Jackson R. DeYoung L. Hulman Project Manager A. Bournia Attorney, ELD NRC Particigants:

M. Rushbrook IE (3)

R. Bosnak ACRS (16)

S. Hou R. Denise P. Barrett E. Hemminger BCC: Applicant & Service List H. Daniels R. Auluck l2

$9 791105053y

. x..

y

. (p ** M %

s' fg UNITED STATES

%y '; ') s, ( i g NUCLEAR REGULATORY COMMISSION

g~fa j WASHINGTON. D. C. 20555

\\(' -

/

OCT 2 41979 Docket Nos.: 50-373/374 MEMORANDUM FOR:

R. J. Bosnak, Chief Mechanical Engineering Branch, DSS FROM:

S. N. Hou, Mechanical Engineering Branch, DSS

SUBJECT:

MEETING MINUTES - EQUIPMENT DYNAMIC QUALIFICATION IN LASALLE PLANT A meeting with Comonwealth Edison Company was held in Bethesda, Md. on October 23, 1979. The purpose of the meeting was.a status review of equipmer.1, dynamic qualification, and a discussion of the applicant's reevaluation program of the NSSS equipment for seismic and hydrodynamic loads.

The meeting concluded the following:

1.

Staff review of the NSSS and BOP equipment programs will be conducted in a time sequence which will focus on the BOP first.

2.

For BOP equipment, the applicant indicated that the qualification program is near completion and he is ready to provide detailed information on the 26 sample items selected by the staff for site audit.

3.

For NSSS equipment, the applicant indicated that Sargent and Lundy will carry out the reevaluation program to ensure that the new seismic requirements are met and the new hydrodynamic loads are considered.

The reevaluation program was presented (see enclosure A). The program is intended to be completed at the end of this year. To expedite staff review, the staff audit will be phased to permit the review of information as it becomes available.

4.

The applicant will conduct in plant SRY tests. Response at several equipment locations will be monitored for confirmation purposes. The applicant will submit the monitoring program for staff review as soon as it becomes available.

5.

The applicant will submit an overall schedule for equipment qualification within the next several weeks.

6.

The applicant submitted M copies of a document entitled, " Seismic Qualification Status, Rev. E', 10/23/79, EMD No. 020279, for staff reviews.

) ') ' '

)50 e-

=e

QCT 2 4 B79 R. J. Bosnak The meeting was attended by the personnel from Comonwealth Edison, Sargent & Lundy and NUTECM, the staff from DPM, MEB, ICSB, and IE, and our contractor, the Naval Research Laboratory (See Enclosure B).

/ttt4 -

W Shou-Nien Hou Mechanical Engineering Branch Division of Systems Safety cc w/ encl:

A. Bournia, DPM J. P. Knight, DSS H. Bramer, DSS

0. D. Parr, DPM F. Cherny, DSS P. A. Barrett, IE/RIII R. Stephens, DSS H. Daniel, DSS E. Heminger, DSS R. Auluck, SD R..L. Bort, NRL 7/"

,R' en e==

Mr. D. Louis Peoples Director of Nuclear Licensing Commonwealth Edison Company P. O. Box 767 Chicago, Illinois 60690 cc:

Richard E. Powell, Esq.

Isham, Lincoln & Beale One First National Plaza 2400 Chicago, Illinois 60670 Dean Hansell, Esq.

Assistant Attorney General State of Illinois 188 West Randolph Street Suite 2315 Chicago, Illinois 60601 Mr. Roger Walker, Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 737 Streator. 1111nois 61364 e

3 9f q7 Ie t

s

ENCLOSURE A pggsENTATioN BY THE, APPLICANT SCOPE OF PRESENTATION

~

INTRODUCTION SQRT REQUIREMENTS:

HIGHLIGHTS BOP APPROACH NEW LOADS AND ITS IMPACT ON BOP APPROACH NSSS APPROACH

'NEW LOADS AND ITS IMPACT ON NSSS APPROACH SARGENT & LUNDY APPROACH TO NSSS OUTSTANDING. ISSUE:

POSSIBLE HIGH FREQUENCY CONTENTS IN NEW LOADS

SQRTEVOLUTION' PLANTS DOCKETED BEFCRE OCT. '72ANDDIDNOT RECEIVE OL.

INTRODUCTIOfi 0F MULTIFREQUENCY AND MULTIDIRECTIONAL SEISMIC INPUT 88 ELECTRICAL EQUIPMENT MECHAllICAL EQUIPMENT FINAL FORM OF 3QRT REQUIREMENTS 1267 154 O

ee w-

SQRT REQUIREMENTS:

HIGHLIGHTS

- US NRC REG. GUIDE 1.92

- US NRC red. GUIDE 1.100

- US NRC SRP 3.9.3 & 3.10

- IEEE - 344 - 1975

- NEW POOL DYNAMICS LOADS

- SQRT FORMS

- SQRT SITE VISIT

- SQRT AUDIT

- 12 7 i55 -

e e

e e

9

REGULATORY GUIDI 1.92 COMBINING MODAL RESPONSES STATISTICAL INDEPENDENCE OF EARTHQUAKE DIRECTIONS AND TIME PHASE R,ELATIONSHIP TIME HISTORY ANALYSIS RESPONSE SPECTRUM ANALYSIS 1267 156 e

e e

e m

e e

/

e REGULATORY GUIDE 1.100 s

e USE OF STATIC COEFFICIENT OF 1.5 IN ANALYSIS

- - USE OF 1.5 COEFFICIENT IN TESTS

==

e SINE SWEEP TEST AS A QUALIFICATION TEST DOCUMENTATION OF ANY MALFUNCTION e

e 12 6~! i57 e

e e

US NRC SRP 3.9.3 & 3.10 ACTIVE ELECTRICAL & MECHANICAL EQUIPMENT OPERABILITY ASSURANCE FUNCTIONAL MONITORING IN TESTS DEFLECTION ANALYSIS 1267 158 9

e

OLD CRITERIA.Vs NEW CRITERIA IEEE-344-1971 IEEE-344-1975 SINGLE AXIS TEST BIAXIAL - SIMULTANE0US EXCITATION IN 2 DIRECTIONS.

SINGLE FREQUENCY MULTIFREQUENCY WAVEFORM TRS ENVELOPING RRS.

~~

~

..S.IllGLEFREQUEfICY&SINGLEAXIS JUSTIFICATION NEEDED TO TEST ACCEPTED WITHOUT SHOW NO RESONANT JUSTIFICATION FREQUENCIES, MODAL PARTICIPATION & CROSS COUPLING.

CANCERTIFhBYCOMPARINGPEAK TRS COMPARED TO RRS.

FLOOR ACC TO TEST ACCN N

DURATION 5 OBE + 1 SSE ACCEPTANCE - SINGLE AXIS, SINGLE' FREQUENCY TESTING ACCEPTED ONLY IF PROPERLY JUSTIFIED OTHERWISE' RETESTING.

~

1267 i59 ge ge e

-me

..g B0P APPROACH s

S&L ORIGINAL SPECIFICATION FORM 350A & 350B VS IEEE-344-1975 CONSERVATISM BUILT IN PIPE MOUNTED EQUIPMENT

~

NEW LOADS & NEW CRITERIA IN ONE PROGRAM

~.

1267 160 e

e O

B0P APPROACH (CONT'D)

COMPARISON BETWEEN OLD S&L STANDARD'& NEW CRITERIA S&L FORM 350-A IEEE-344-1975 SWEEP TEST 2 TO 33 HZ TO 2 HZ FREQUENCY RANGE OF HIGHER FREQUEi:CY QUALIFICATION RANGE SPECIFIED WHERE REQUIRED OCTAVE / MIN. 1,29,16,64 SWEEP RATE 5 HMMIN NOT TO EXCEED 2,7,12,11,22,27,32,37 EXCITATION TRIAXIAL BIAXIAL BI AXIAL IF NOT POSSIBLE DURATION 69 SEC - OBE +

5 OBE + 1 cSE bU SEC - SSE SINGLE AXIS ALLOWED WITH PROPER -

SAME AS S&L FORM TEST JUSTIFICATION 350-A INPUT ZPA ZPA ACCELERATION RANDOM TRS TO ENVELOPE RRS TRS TO ENVELOPE RRS MOTION TEST 1267 i61 e

--hew--.

e

B0P APPROACH. (CONT'_D)

NEW LOADS & NEW CRITERIA IN ONE PROGRAM

- SUPPLEMENTAL CALCULATION

- COMBINED ANALYSIS & TESTING

- GENERIC TEST DATA

- LASALLE UNIQUE TEST (NEW)

- REANALYSIS UNDER PRESENT CONSIDERATION

- INPLANT IMPEDANCE TESTS

- INPLANT SRV TESTS e

e em t e a e

B0P APPROACH (CONT'D)

NEW LOADS (DESIGN BASIS)

~

WHAT ARE THE NEW LOADS CONSIDERED-

~

~

N + SRVALL N + SRVALL + OBE N + SRVALL + SSE N + SRVADS + IBA N + SRVADS + OBE + SBA N + SRVg3 + OBE + IBA N + SRVADS + SSE + SBA OR IBA N + SSE + DBA LOAD COMBINATIONS IN RE-EVALUATION N + SRVALL + OBE - UPSET N + SRVALL + SSE - EMERGENCY WHY - B0UNDING LOAD CASI e

e BOP APPROACH (CONT'D)

REQUALIFICATION COMPLETED FOR ALL BOP EQUI _PMENT EXCEPT AS NOTED.

REQUALIFICATION LOAD COMBINATION,S ARE:

(RAMSHEAD)

OBE + SRVALL (RAMSHEAD)

SSE + SRVALL PRELIMINARY ASSESSMENT COMPLETED FOR THE FOLLOWING SRV TQ. LOADS ENVELOPE OBE+JSRVALL.TQ +SRVAS.TQ SSE +

SRVALL.TQ + SRVAS.TQ ENVELOPE i267 i64

BOP APPROACH (CONT'D)

ACCEPTANCE CRITERIA

~

y A.

EQUIPMENTPROCUREDTOIEEE-344-19719ASACCEPTED ONLY IF IT MEETS THE INTENT & PHILOSOPHY OF IEEE-344-1975.

-B.

ADDITIONAL CALCULATIONS PERFORMED WHERE NECESSARY TO INCLUDE POOL DYNAMIC LOADS.

C.

RETEST DONE WHERE NECESSARY.

D.

HARDWARE MODIFICATION DONE WHERE NEEDED.

OUR QUALIFICATION ACCEPTANCE CRITERIA HAS BUILT-IN CONSERVATISM AS SHOWN NEXT, e

12 67

M' O

eo e o e

B0P APPROACH (CONT'D)

CONSERVATISffIN RE-EVALUATION

~

~

USE OF DAMPING VALUES FAR LOWER THAN THE VALUES 1.

RECONMENDED BY REG. GUIDE 1.61 AND IEEE-STD-344-1975.

~

RESPONSE SPECTRUM 2.

USE OF ONE RADIAL RESULTANT SRVALL (HORIZONTAL) CURVE IN THE 2 HORIZONTAL DIRECTIONS.

s RESPONSE SPECTRUM CURVES BY 3.

PEAK BROADENING 0F SRVALL AS HIGH AS 15%.

4.

USE OF RESPONSE' SPECTRUM CURVES RATHER THAN THE TIME HISTORY.

S.

LOAD' MITIGATING DEVICES THAT ARE BEING CONTEMPLATED WOULD REDUCE THE POOL DYNAMICS. LOADS THAT WERE USED IN THE RE-EVALUATION.

i267 166 e

e

BOP APPROACH (CONT'D)

REQUALIFICATION STATUS

SUMMARY

PERCENTAGE OF COMPLETION - 90% (EXCEPT VALVES)

VALVES - WAITING FOR FINAL PIPING LOADS NEW TESTS COMPLETED - SEE SLIDE NEW TESTS PLANNED - SEE SLIDE OUTSTANDING ITEMS - SEE SLIDE

,o 1267 167 e

4 e

e e

g e a 4 e G

~

GE APPROACH TO NSSS EQUIPMENT EQUIPMENT QUALIFIED PER IEEE-344-1971 SOME QUALIFICATION REPORTS MET THE INTENT OF IEEE-344-1975 REQUALIFICATION COMPLETED FOR NEW RAMSHEAD POOL DYNAMIC LOADS 1267 168 '-

e O

e D

ee b

S&L PROPOSED APPROACH TO NSSS EQUIPMENT

~~

~

PHASE I:

EVALUATION 8 MINOR ADJUSTMENTS A.

EQUIPMENT ACCEPTED AS IS B.

SIMILAR EQUIPMENT (OF OTHER PLANTS) ARE QUALIFIED FOR LA SALLE APPLICATION C.

EQUIPMENT WITH EXISTING QUALIFICATION COULD BE UPGRADED TO BE ACCEPTABLE WITH MINOR ANALYTICAL CALCULATIONS METHODS OF RE-EVALUATION A.

SINGLE FREQUENCY SINGLE AXIS TEST I.

OBTAIN NEW R.S.C.

II.

CHECK TEST 'G LEVEL WITH'NEW 'G' LEVEL III.

CHECK CROSS COUPLING EFFECTS ARE CON-SIDERED B.

SINGLE FREQUENCY BIAXIAL TEST I.

OBTAIN NEW R.S.C.

II.

CHECK TEST 'G' LEVEL WITH NEW 'G' LEVEL III.

CHECK INPHASE OUT-OF-PHASE C.

MF OiF?',EQUENCY BI AXI AL TEST UBTAIN NEW R.S.C.

~

i4, INPUT IS PHASE INCOHERENT TRO ENVELOPS RRS 1267 169 db

e _ e.

S&L PROPOSED APPROACH TO NSSS EQUIPMENT (CONT'D)

~

PHASE.II: -UPGRADING QUALIFICATIONS EY ANALYTICAL TECHNIQUES

~

A.

CASES WHERE EXISTING QUALIFICATIONS WERE ACHIEVED BY ANALYSIS B.

CASES WHERE EXISTING QUALIFICATIONS WERE ACHIEVED BY TESTING PHASE III: dPGRADINGQUALIFICATIONSBYTESTING A.

SUPPLEMENTARY TESTING B.

COMPLETE QUALIFICATION TESTING e

1267 170 0

e ee

S&L PROPOSED APPROACH TO NSSS EQUIPMENT (CONT'D)

N PHASE'IV:

MODIFICATIONS A.

EQUIPMENT UNACCEPTABLE ~

B.

MODIFICATION MAY REDUCE INPUT TO PRESENT QUALIFICATION LEVELS PHASE V:

EQUIPMENT REPLACEMENT A.

EQUIPMENT INCAPABLE OF WITHSTANDING LOADS B.

NEW QUALIFICATIONS ARE MORE EXPENSIVE THAN PRICE OF NEW QUALIFIED EQUIPMENT 1267 171 5

O e

b

~

I I'

OUJSTANDING ISSUE s

1-50 Hz NEW LOADS FREQUENCY RANGE ORIGINAL QUALIFICATION FREQUENCY RANGE 1-33 Hz SUGGESTED SOLUTIONS USE OF zPA AT 33 Hz TRS FREQUENCY RANGE UPTO 100 Hz OR MORE INFLANT SRV TEST INPLANT IMPEDANCE TESTS IfiPLANT FUNCTIONAL TESTS GENERIC TESTING FOR MARK II LEAD PLANTS i267 i72

)

S se::tm 3,4'erc6ce Source; SEISMIC CIKTIFICATION T.I?CRT P

~.

Could Report No. 33-52612-SSA -

.Tast Program No. 43697 -

.~

' Run No. 23, HCA,17. (SSE)

Page 32 of '4

{..

T.RS & RRS.',FOR 6,9. KV SWI.TCHGEAk -

l.

L. 2 AP08E s'69E 100 80

-4 SPE w 0i DESCRI? TION.

a-60 Z Motion Input : Side-to-Side / Vertical 40 F.S. Accel.

- 100 g. Peak.

-- Damping

' 1%.

H

.Hori:. TRS, analy,:ed at 1/3

~

30 Point Curve octave frecuencies by Hori:.

=

2d Solid Cutte

.: C t rs i: SS R35

.............n,..,,,....,,............................,,...,..-

s...

c......

na....,. ~

, 1.n a

.o.

,a

.o

~

8 e

Jd i

i

.i,..

as

  • 6

..i,,

ar.

===._

m

.w.

4 c

o u-3 5.

.==

=

c=s e

e.4 2

o u

~,

~

s i

r.

.,.r..,.

s

.. s.

,,a

......,.i.

..s.

s.

............,. r..,..,,.

1,n va

.o.

~... ~,~ o...

\\.

....a.v.

o.

+

s w

0.8 X

s

.)

J q %[ } p

  1. i

%]4.,

(

g 0*6-

,;.A& &'

r

=-

-,n 0.4

[

q -

0.3 0.2 i-L4 t- -

-"'1 i

0.1

. ~ ' '.

I'. :-' -

'~

~ ~ ' ~ ~ - -

i s s : e s i:

s. : i r ia a

2 s

4.

0.4 1.0 10 100 Frequency (H:)

-C; Figure SD r

COMPARISON OF THE C'.'STCMER'S F.OR:20NTAI. SSE RRS TO TdI HORIZONTAL

. SIDE-TO-SDE TRS CF Td! 15F.K-5CO S *ITcHCI.a TIST S?gCInzy 1267.173

- -. G '...

. TESTING TO VERY HIGH 'G' LEVEL ic 28 to to e

2' 8 '

1\\

i I

i im m

^'I J

\\_/

i\\

IM l

\\

l

'*1 l /

q

(

ac 06 l

o.c 04 y

~.

10e too 50 s3 to to 20 t.o 2.00 too.so 33 zo to 14 s.,o FREQUENCY, HZ FREQUENCY, HZ ABSOLUTE SUM RESPONSE SPECTRA REACTOR BUILDING-EL. 820' 6" COMPONENT NAME:

TEMPERATURE TRANSt,$4E ER ROSEMOUNT MODEL #3JJt MOUNTING:

MOUNTED ON SGTS TRAIN NATURAL FRE-h1 = 26.6 HZ h2 = 21 HZ v = 25 HZ QUENCY ON SGTS TRAIN:

RESONANCE 5 TO 50 HZ NO RESONANCE ON COMPONENT SEARCH TEST:

REQUIRED 'G' h1 = 0.65 HZ h2 = 0.625 HZ v = 1.26 LEVEL:

-PROOF TESTING:

h1=h2 = v = 5 s's FRAGILITY hy=h2 = v = 20 s's TESTING:

1267 174 b

i TYPICAL RESPONSE SPECTRUM ZPA AT 33 HZ'VS. ZPA AT 50 HZ FREQUENCY, CPS 200 100 50 33 20 10 5

2 1

I 20.0 10.0 i

e i

1 i

i l-I-

l l

I

~

5.0 1

/

j b

\\

~

~

2.0 1.43

/

r

~

)

~

z 1,0 i

0.92

~

~

I

\\

s e

-i

\\ 1/

M 1 \\

f o

N 0.5

~

F N

~

\\

~

'\\

waw

(

u 3

e N :

0.2 l

~

,,[

0.10 e

i e

ii i

i i

i..

6 ii i

e i

ii I

'i 1

l l i

l l-0.05

,,,. I.... I.,,, l..

,, I... I,,,,

il,

,,,,l.,,,l.,,,l,,,, l.,. l.,,, ',

. I,1 ;-

0.0005 0.01 0.02 0.05 0.1 0.2 0.5 1.0 PERIOD, SEC OBE - VERTICAL ABSOLUTE SUM OF SRV (1% DAMPING) AND SEISMIC (1% DAMPING)

REACTOR BUILDING - EL. 740'-0" I?67 17ac

B0P APPROACH (CONT'D)

EQUIPMENT TESTED WITH TRS ENVELOPING RRS TEST IPA REQ'D ZPA TRS EQUIPMENT NAME FREQUENCY RANGE H

H V

H H

V l-1 2

1 2

Hz.

, LIQUID-LEVEL CONTROL "MAGNETROL" 1 - 250 3. 0.

3.2 1.1

.45

.45 1.0 MODEL

  1. 291
  1. ROSEMOUNT PRESSURE TRANSMi rTER 1 - 250 1.4 2.0

.9

.68

.68

.85 MOD'EL #1152GP & 1152DP

'ROSEMOUi4T' PRESSURE TRANSMITTER 1 - 250 1.4 2.0

.9

.68

.68

.85 MODEL #1151DPSA & 1152DP5A I

6.9 KV SWITCHGEAR 1 - 100 3.2 3.2 4.2

.6

.6

.9

~

LOVE CONTROLS' INDICATOR #48 1 - 40.6 12.0 12.0

<12.0 3.0

<3.0 <3.0 RTD ' WEED'

  1. 601 TEMP. CONTROLLER ' LOVE' #56 PROPORTIONAL TEMP. CONTROLLER j

' LOVE' #54 CONTROL RELAY

'GE' MODEL HFA CONTROL RELAY

'GE' MODEL HM TIME DELAY RELAY ' AGASTAT' #7012AD TRANSF.ER SWITCH 'GE' #SMB 1

! TRAUSFERSWITCH'GE'#SB-1 M

'I T

'I V

Y f

f

' TEMPERATURE CONTROL SWITCH 3'UE' MODEL #F303D-5AS i

m I26/

/6

B0P APPROACH (CONT'D)

EQUIPMENT TESTED.WITH TRS ENVELOPING RRS TEST ZPA

'g' REQ'D ZPA 'g' TRS EQUIPMENT NAME '

FREQUENCY I

RANGE Hz h

h Y

h h

Y l

2 y

2 i

'NAMCO SNAP LOCK SWITCH #EA700 1 - 40.6 12.0 12.o 12.o

<3.o <3.o <3.o PRESSURE TRANSMITTER 'HA S' #252 i

l l

'ITT' DAMPER ACTUATOR

  1. NH91 I

'ITT' DAMPER ACTUATOR

  1. NH95

'ITT DAMPER ACTUATOR (AH91

{

l

'ITT' DAMPER ACTUATOR (AH95 4

,r y

v v

v i

V!

l l

POST-LOCA HYDROGEN RECOMBINER 1 - 100 1.8 1.8 1.7

.6

.6

.94 l t

,i i

I l

~

i c

1 4

t 126/

177

B0P APPROACH (CONT'D)

BOP EQUIPMENT TESTED TO VERY HIGH 'G" LEVELS REQ'D ' LEVELS TEST 'G' LEVELS G

EQUIPMENT NAME FREQUENCY RANGE h

h v

h h

V l

2 y

2 Hz.

'ASHCROFT' PRESSURE O - 35 7.5 10.0 10.0 1.2 1.2 1.45 INDICATCR

  1. 1279 NITROGEN CYLINDER MANIFOLDS 1 - 50 6.0 6.0 6.0

.8

.8 1.4

'ASHCROFT' PRESSURE SWITCH 6450s 0 - 35 10.0 10.0 7.5 1.2 1.2 1.45

  1. ASHCROFT' PRESSURE SWITCH
  1. B464 0 - 35 10.0 10.0 7.5 1.2 1.2 1.45 TEMPERATURE TRAN.SMITTER S - 50 20.0 20.0 20.0

.6

.6 1.4

'ROSEMOUNT' #535E

'ROSEMOUNT' PRESSURE 5 - 100 3.0 3.0 3.0

.6

.6 1.4 TRANSMITTER

  1. 1152

~

'NAMCO LIMIT SWITCH

  1. EA170 1 - 35 4.0 4.0 4.0

.8

.8 1.48

'NAMCO' LIMIT SWITCH

  1. EA060 1 - 35 4.0 4.0 4.0

.8

.8 1.48

'NAMQO' LIMIT SWITCH

  1. EA080 1 - 35

.4.0 4.0 4.0

.8

.8 1.48; i

1.48!

'NAMCO' LIMIT SWFTCH

  1. EA780 1 - 35 3.0 3.0 3.0

.8

.8 i

i t

'NAMCO' LIMIT SWITCH

  1. EA740 1.35 3.0 3.0 3.0

.8

.8 1.48

'NAMCO' LIMIT SWITCH

  1. EA790 1 - 35 3.0 3.0 3.0 i

.8

.8 1.48I I ?67 1 78.

I

M=

B0P APPROACH (CONT'D)

REQUALIFICATION STATUS

SUMMARY

~~

A.

REQUALIFICATION COMPLETED TO NEW LOADS AN.D NEW CRITERIA 1.

PRESSURE SWITCH 'ASHCROFT' MODEL #B4648XFSNFGN 2.

LIQUID LEVEL CONTROLS MAGNETROL' MODEL #SIMD4DC 3.

PRESSURE TRANSMITTER 'ROSEMOUNT' MODEL #1152GP AND 1152DP 4.

PRESSURE TRANSMITTER 'ROSEMOUNT' MODEL #1151DP5A AND 1152DP5A 5.

SUPPRESSION POOL SUCTION STRAINERS 'PERMUTIT' 6.

PRESSURE INDICATOR ' ASHCROFT' MODEL #1779 7.

PRESSURE SWITCH MODEL #4505 8.

NITROGEN CYLINDER MANIFOLDS i'75-7-456.261' 9.

SGTS CONTROL PANEL 10.

SUPPRESSION POOL TEMPERATURE MON:TORING POWER SUPPLY PANEL 11.

CONTAINMENT ELECTRICAL PENETRATIONS 12.

COIL CABINETS "BHANSON C0" 13.

COIL ASSEMBLIES " CARRIER" y

'E 14.

FANS FOR SGTS UNIT 1267 119 se

A.

REQUALIFICATION COMPLETED TO NEW LOADS AND NEW CRITERIA (CONT'D)

~

15.

PRESSURE DIFFERENTIAL iRANSMITTER 'ROSEMGUNT' MODEL #1152 16.

TEMPERATURE TRANSMITTER 'ROSEMOUNT' MODEL #535E 17.

SGTS EQUIPMENT TRAIN WITH ALL COMPONENTS 18.

FAN CHECK DAMPERS 'TECHNO CORPORATION 19.

STEAM TUNNEL CHECK DAI'.PERS 'TECHNO CORPORATION' (VARIOUS SIZES) 20.

'NAMCO LIMIT CONTROL SWITCHES MODEL #EA170, EA060, EA080, EA780, LA740, EA790 21.

ISOLATION DAMPERS 'TECHNO CORPORATION 22.

CsCS EQUIPMENT AREA COOLING FANS ' JOY' 23.

CSCS EQUIPMENT COOLING FANS ' JOY' 24.

HVAC CONTROL PANELS

~

25.

HPCS WATERLEG PUMPS 26.

RC5CWATERLEGPUMPS 27.

RHR WATERLEG PUMPS 28.

LPCS WATERLEG PUMPS 29.

HYDORGEN RECOMBINER ASSEMBLY #N116E000056-01 t

r

.[

1267 180 g

B0P APPROACH (CONT'D)

REQUALIFICATION STATUS SufidAP.Y B.

NEW TESTS COMPLETED TO NEW LOADS & NEW CRITERI A 1.

INDICATORS ' LOVE CONTROLS' MODEL #48-81185-8174 2.

RESISTANCE TEMP. DETECTOR ' WEED MODEL #601 3.

TEMP. CONTROLLER ' LOVE' MODEL #56 4.

PROPORTIONAL TEMP. CONTROLER ' LOVE MODEL #54 5.

CONTROL RELAY 'GE' MODEL #HMA11B11 6.

CONTROL RELAY 'GE' MODEL #HFA51A49 7.

TRANSFER SWITCH 'GE MODEL #5B-1 8.

TRANSFER SWITCH 'GE' MODEL #5B-1 9.

T.IME DELAY RELAY ' AGASTAT' MODEL #7012AD 10.

SNAP LOCK SWITCH 'NAMCO' MODEL #EA700 11.

TEMP. CONTROL SWITCH ' HAYS' F0 DEL #252 12.

DAMPER ACTUATOR 'ITT GENERAL CONTROLS MODEL #NH91 13.

DAMPER ACTUATOR 'ITT GENERAL CONTROLS' MODEL #NH95 14.

DAMPER ACTUATOR 'ITT GENERAL CONTROLS' MODEL #AH91 15.

DAMPER ACTUATOR 'ITT GENERAL CONTROLS' MODEL #AH95 t-1267 181

30P APPROACH (CONT'D)

REQUALIFICATION STATUS SUMARY C.

NEW TESTS PLANNED ON:

~

1.

480v McC (FOR NEW LOADS) 2.

250V D.C. DISTRIBUTION EQUIPMENT (FOR NEW LOADS) 3.

480V UNIT SUBSTATION (FOR NEW CRITERIA)-

1267 182

.S 9-ll

BOP APPROACH (CONT'DF REQUALIFICATION STATUS

SUMMARY

D.

OUTSTANDING ITEMS REASONS ALL VALVES WAITING FOR PIPING LOADS MOTOR OPERATORS WAITING FOR PIPING LOADS SWGR UNITS DOCUMENTATION FOR DEVICES SOME HVAC ORIGINAL QUALIFICATION COMPONENTS NOT RECEIVED PAPC MONITORING TEST NOT COMPLETED PANEL TEST PROCEDURE APPROVED I267 i83 0

9

~

ENCLOSURE B Meeting Attendees 10-23-79 Nane Affiliation Anthony Bournia NRC/DPM R. J. Bosnak NRC/ DSS S. Hou NRC/ DSS P. A. Barrett NRC/IE/RIII E. Heminger NRC/ DSS Y. T. Kim NRL R. L. Bort NRL George R. Crane Commonwealth Edison J. Sinnappan S&L A. E. Meligi S&L Louis DelGeorge Commonwealth Edison Howard Daniels NRC/ICSB Tim Martin NUTECH L. S. Gifford GE R. Auluck NRC/SD F