ML19254E961
| ML19254E961 | |
| Person / Time | |
|---|---|
| Issue date: | 10/19/1979 |
| From: | Mcpherson G, Lisa Sullivan NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| To: | Bailey H, Burchill, Docherty P ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, BABCOCK & WILCOX CO., WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| Shared Package | |
| ML19254E962 | List: |
| References | |
| NUDOCS 7911050121 | |
| Download: ML19254E961 (5) | |
Text
^
UNITED STATES
[
- g NUCLEAR REGULATORY COMMISSION y
j IDAHO FIELD OFFICE 2
550 SECCND STREET 4,
[
IDAHO FALLS, IDAHO 83401 October 19, 1979 Those on Attached List Gentlemen:
Subject:
Joint Semiscale and LOFT Review Group Meeting There will be a joint Semiscale and LOFT Review Group Meeting on November 1 and 2,1979, in Room Pil0, of the Phillips Building, 7920 Norfolk Avenue, Bethesda, Maryland.
Enclosed is an agenda for that meeting and materials for discussion including:
1.
Semiscale EOS for Small Breaks.
2.
LOFT EOS for Operational Transients (L6 Series).
3.
LOFT EOS for Small Breaks (L3 Series).
4.
Draft of RIL for LOFT Experiments L2-2 and L2-3.
5.
Minutes of the June 15 LOFT Review Group Meeting.
All merr5ers, advisors, and consultants are cordially invited to attend.
Si erely,
[,
'M ' O G. D. McPherson, Chief LOFT Research Branch Division of Reactor Safety Res rch
,['
n L. H. Sullivan, Chief
/
Separate Effects Branch Division of Reactor Safety Research
Enclosures:
As stated 7911050
.g 1266 001
Addressees - Letter Dated October 19, 1979
Enclosures:
Agenda and Item No. 1 Only H. Bailey, B&W W. Burchill, CE R. DiSalvo, PAS P. J. Docherty, W G. Holahan, NRR ~'
G. F. Owsley, EXXON L. H. Sullivan, RES K. F. Sun EPRI
Enclosures:
Agenda and Items No. 2 through 5 Only M. Akimoto EG&G Idaho C. H. Berlinger, NRR K. J. Brinkman, ECN, NETHERLANDS P. Y. Chen, NRR D. Eisenhut, NRR M. D. Houston, NRR W. Kato, BNL S. T. Kelppe, EG&G Idaho N. N. Kondic, RES R. R. Landry, RES G. Markoczy, SFIfFR, SWITZERLAND M. Meerbaum, B&W G. Menzel, CE C. Moser, EI H. Nakamura, JAERI, JAPAN A. Olsen, RISO, DENMARK S. Z. Rouhani, EG&G Idaho P. J. Schally, EG&G Idaho N. H. Shah, B&W T. M. Su, NRR T. Sudoh, EG&G Idaho G. H. Weimann, EG&G Idaho K. R. Wichman, NRR L. Winters, EG&G Idaho 1266 002
4 Addressees - Letter Dated October 19, 1979 L. Agee, EPRI S. Banerjee, McMaster Univ.
R. W. Barber, DSE, DOE-HQ W. Binner, IfR, AUSTRIA J. Block, CREARE G. F. Brockett, ITI I. Catton, ACRS S. Fabic, RES R. Fraley, ACRS (3 cys)
P. Griffith, MIT S. Hanauer, NRR Y. Y. Hsu, RES W. V. Johnston, RES S. Kellerman, W R. T. Lahey, RPI N. Lauben, NRR D. Lummerzheim, FRG F. Mayinger, LulfV, GERMAN)
T. E. Murley, RES P. E. Norian, FRR T. M. Novak, NkR F. Odar, NRR K. Darczewski, NRR D. Ross, NRR Z. R. Rosztoczy, NRR B. Sheron, NRR M. Shiba, JAERI, JAPAN P. O. Strom, RES L. S. Tong, RES J. D. White, ORNL Public Document Room (2 cys)
Enclosures:
Agenda Only R. G. Bearden, EG&G Idaho
.f. W. Bixby, DOE C. B. Davis, EG&G Idaho N. C. Kaufman, EG&G Idaho L. P. Leach, EG&G Idaho P. North, EG&G Idaho D. J. Olson, EG&G Idaho J. E. Solecki, DOE-ID L. J. Ybarrondo, EG&G Idaho 003 126o/
LOFT /SEMISCALE REVIEW GROUP MEETING AGENDA Thursday, November 1,1979 Time Subject Presenter 8:30 Introduction G. D. McPherson/H. Sullivan 9:00 Semiscale Results 1.
Introduction (10 minutes)
D. J. Olson 2.
Boiltff Tests 3.
Natural Circulation Tests 1
4.
Small Break Results to Date
> (1:20)
G. W. Johnsen 1
5.
Upper Head Drain Tests 6.
Nozzle Calibration Results
/
10:30 Break 10:45 Semiscale Scaling Analysis T. K. Larson 12:00 Lunch 1:00 LOFT L3-0 Results D. B. Jarrell 1:45 Application of LOFT Information t S. A. Naff LPWR Operations 2:15 Break 2:30 LOFT L2-2 and L2-3 RIL Summary G. D. McPherson 3:00 Comment on RIL Review Group 4:00 Discussion of LOFT and Semiscale G. D. McPherson/H. Sullivan Results 5:00 Adjourn 1266 004
LOFT /SEMISCALE REVIEW GROUP MEETING AGENDA (Continued)
Friday, November 2. 1979 Time Subject Presenter 8:30 Introduction G. D. McPherson/H. Sullivan 9:00 Definition of Pumps-On/ Pumps-Off Z. Rosztoczy Problem 9:30 LOFT Pumps-On/ Pumps-Off Test Plans W. C. Phoenix 10:00 Break 10:15 Other LOFT Small Break Plans W. C. Phoenix 11:30 Lunch 12:30 Semiscale Future Work G. W. Johnsen 1:45 LOFT Future Work /L6 Series J. R. White 2:45 Break 3:00 Fault Diagnostic Computer
- 0. R. Meyer 3:45 Instrument Calibration
- 4. J. Quapp 4:15 Additional Items G. D. McPherson/H. Sulli, van
)2(6
'305