ML19254E739
| ML19254E739 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 09/24/1979 |
| From: | Moody D Maine Yankee |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| WMY-79-101, NUDOCS 7911020274 | |
| Download: ML19254E739 (1) | |
Text
&
... =
MAIRE ' ~
$ -@M(3UARHEE MGm!GF0WERCEMFARS e
-j TURNPIKE ROAD (RT. 9) ur ENGINEERING OFFICE WESTBORO, MASSACHUSETTS 01581 617-366-9011
_.=5 9 B.4.2.1 WMY 79-101 September 24, 1979 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of PTussia, Pennsylvania 19406 Attention:
Mr. Boyce H. Grier, Director
References:
(a) License No. DPR-36 (Docket No. 50-309)
(b) USNRC I&E Bulletin No. 79-18, dated August 7, 1979
Dear Sir:
Subject:
Response to I&E Bulletin 79-18 Although the Maine Yankee Plant was operating at the time the subject Bulletin was received, the necessary surveys could not be completed prior to the plant shutting down for a scheduled outage on September 1, 1979.
Since the plant must be at power to achieve the " maximum anticipated noise level" required by this Bulletin, the necessary surveys shall be completed following a return to power.
In accordance with item #3 of the subject Bulletin, within 30 days of startup following this outage, a written report shall be submitted, detailing the findings of these surveys and delineating the completed or proposed corrective actions.
Should any further information be required, please feel free j,g ontact us.
~6h Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY d)
Yl Q Dona [dE. Moody /
Manager of Operations DDf/smw 1249 061 7911020 h 7 9