ML19254E684

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-329/79-18 & 50-330/79-18.Corrective Actions: Personnel Reinstructed Re Protection of Installed Equipment During Welding Operations
ML19254E684
Person / Time
Site: Midland
Issue date: 10/12/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19254E683 List:
References
HOWE-266-79, NUDOCS 7911020158
Download: ML19254E684 (2)


Text

.

Or Consumers Power Company SJ'f"";,""1 General Of fices: 194's West Pernali Road, Jackson, Michigan 49201 * (517) 788-0453 s

October 12, 1979 Hgue-266-79

?& J G Keppler, Regional Director Office of Inspecticn and Enforcement US I;uclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIED I~JCLEAR PLMff -

INSPECTION REPORP I!O 50-329/79-18 mir NO 50-330/79-18 The enclosure to this letter is a response to your letter of Septe=ber 11, 1979, which transmitted the subject Inspection Report and which requested our vritten statement on an item of noncompliance.

3 b _'qy

(

- c - L ts I

I o

was/lr

Enclosure:

Consu~.ers Power Company's Response to Inspection Report No 50-329/79-16 and No 50-330/79-18

-/7f}

I OCT 15 C 7911020/S/

Enclosure to Howe-266-79 CONStrERS POWER CO'fPAHY RESPONSE o

TO THE NOTICE OF VIOLATION

_DF.SCRIEED IN NBC IMSPEC ION RFPOR"'

D0. 50-320/70-18 AND MO. 50-330/70-18 s

A.

PERFOR' TING WELDING ACTIVITIES WITHOUT PROTECTING INSTALLED CABLES, h.1Gy SWITCH GEAR AND L30V '<0 TOR CONTROL CENTERS.

(329/79-18-02; 330/79-18-02)

Descrirtion of Nonconpliance Appendix A of Report No. 50-329/79-19 and 50-330/70-18 provides the follow-ing-

"10 CFP 50 Appendix 3, Criterion XIII requires, in part, to establish measures to control the handling, storare, clean-inc and preservation of material and equipment in accordance with work and inspection instructions to prevent damare or det erio rat ion.

CFCo procedure FPG-7.000 Revision 0, dated July 1. 197~,

Pararraph 7.c establishou controls to protect material and equip ent from activities such as veldinc.

Ccntrary to the above, on August 21 and 22,1979, the inspectors accompanied by licensee representatives observed weldine activities in progress at elevation 61h' in the auxiliary building, above installed h80V and L.16KV switch-gear with inadequate protection to prevent weld spatter from falling on installed equipment and cable "

CPCo Festonse The affected equipment that could have been damaged by the weldinc activity has been inspected by Bechtel QC.

The only danace noted was the paint on the top of 'ICC 1B23 above cubicle 1A which has been documented on Bechtel Discrepancy Report No. E-17hl.

To avoid future occurrenr- 'f this problem, the Bechtel Site Manacer reinforned Field Enrineers, Superintendents, General Foremen, and Foremen of the necessity to protect installed equipment and reiterated their responsibility of assurinc that adequate requirements and procedures exist for the protection of installed equipment durine velding operations.

This was accomplished by a combinaticr of a memo to, training sessions with, and personal interviews with these persons.

This action is considered effective immediately and we consider that full compliance has been achieved.

h 78 BW'!/lr 10/12/79 Ih/