U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I Report No.
70-1100/79-05 Docket No.
70-1100 License No.
SNM-1067 Safeguards Group 3
Licensee:
Combustion Engineering, Incorporated P. O. Box 500 Windsor, Connecticut 06095 Facility Name:
Nuclear Power Systems - Manufacturing Inspection At:
Windsor, Connecticut Inspection Conducted:
July 10-12, 1979 Date of Last Material Control and Accounting Inspection:
March 23, 1979 Type of Inspection: Announced Material Control and Accounting Inspectors:
,)
R - D- ) 5 I. Cohen, Chemist dat date date Approved by:
B-3/- 7 9 i
J. V oyn r, Chidf, Nuclear Material Control date Support ection, Safeguards Branch Inspection Summary:
Areas Inspected:
Physical Inventory Procedures.
The inspection involved 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> on site by one NRC inspector and was begun during regular hours.
Results:
The licensee was found to be in compliance with the NRC requirements in the area examined.