ML19254E566

From kanterella
Jump to navigation Jump to search
Forwards LER 79-085/03L-0
Date released: 09/25/2019 Download: ML19254E566


LER 79-085/03L-0:791013,while Performing HNP-1-3410,reactor Core Isolation Cooling Steam Line Flow Functional Test & Calibr,Switch Contacts for 1E51-N017 Failed.Caused by Instrument Drift.Switch Calibr & Set to Correct Setpoint
ML19254E572
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/25/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254E572 (1)
Forwards LER 79-085/03L-0
ML19254E565
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/25/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254E565 (1)