ML19254E553

From kanterella
Jump to navigation Jump to search
Forwards LER 79-083/03L-0
Date released: 09/25/2019 Download: ML19254E553


LER 79-083/03L-0:on 791007,during Normal Operation,Reactor Protection Sys Motor Generator a Set Tripped.Caused by Overheated Coil of GE Control Rod 120A Control Relay.Damaged Relays Replaced & Motor Generator a Set
ML19254E559
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/22/1979
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254E559 (2)
Forwards LER 79-083/03L-0
ML19254E552
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/23/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254E552 (1)