ML19254E497

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-030/03L-0 & 79-031-03L-0
ML19254E497
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/25/1979
From: Opeka J
NORTHEAST UTILITIES
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19254E498 List:
References
MP-2-4173, NUDOCS 7911010395
Download: ML19254E497 (1)


Text

@lDNT&31?M23'0'E3Tal.7T03333

'I hhfh,'  ? ~~~ ~

i \ t T> Z;:%%':l,T:LTlCl October 25, 1979 MP 4173 Ifr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement U. S. fluclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License 110. DPR-65 Docket tio. 50-336 Reportable Occurrence R0-50-336/79-30/3L-0, 79-31/3L-0

Dear fir. Grier:

This letter forwards Licensee Event Reports 79-30/3L-0 and 79-31/3L-0 required to be subnitted within thirty days pursuant to itillstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode permitted by a limiting condition for operation. An additional three copics of each report are enclosed.

Yours truly, cA

. F. Opeka Station Superintendent .

11illstone fluclear Power Statidn JF0/RB:llm

Attachment:

LER's 79-30/3L-0, 79-31/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Itanagement Infonnation and Program Control , Washington, D.C. (3)

I 1281 001 791101039 [ S