Joint Motion in Support of ASLB 771230 Decision Imposing License Conditions.Urges Issuance of Order Adopting Encl Compromised Conditions Which Permit Full Disposition of Proceeding.Certificate of Svc Encl
ML19254E445
Person / Time
Site: Midland
Issue date: 09/25/1979
From: Jablon R, Ross W
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), NORTHERN MICHIGAN ELECTRIC COOPERATIVE, INC., SPIEGEL & MCDIARMID, WALD, HARKRADER & ROSS, WOLVERINE POWER SUPPLY COOPERATIVE, INC. (FORMERLY
To:
Atomic Safety and Licensing Board Panel
References
NUDOCS 7911010118
Download: ML19254E445 (24)


Text

"

p g

Ef.

-t UNITED STATES OF AMERICA 9,' N n'

J L

BEFORE THE ATOMIC SAFETY & LICENSING BOARD h, rdY

/

4 NUCLEAR REGULATORY COMMISSION

' &t y In the Matter of

)

)

Docket Nos. 50-329A CONSUMERS POWER COMPANY

)

50-330A Midland Plant, Units 1 and 2

)

JOINT MOTION OF CONSUMERS POWER COMPANY AND INTERVENORS SUPPORTING IMPOSITION OF LICENSE CONDITIONS Consumers Power Company and the IntervenorsW submit herewith proposed antitrust conditions to the Midland construc-tion permits and move that they be included in the permits in full disposition of this proceeding.

If adopted as proposed, Consumers Power and the Intervenors' systems have agreed not to seek review of this Board's order imposing such conditions or to seek review of any other order issued in this proceeding.

We are advised that all of the parties to this proceeding sup-port the imposition of these conditions.

Therefore, their adoption by the Board will fully dispose of all outstanding issues in this proceeding.

In submitting these proposed license conditions, Consumers Power. admits no violation of any law or any conduct inconsistent with the antitrust laws or the policies thereunder.

-1/

The Intervenors include the following parties:

the Cities of Coldwater, Grand Haven, Holland, Traverse City, and Zee-

~

land, the Northern Michigan Electric Cooperative, Inc.,

Wolverine Electric Cooperative, and the Michigan Municipal Electric Association.

1281

07 1 n 7911010
y

. Likewise, Consumers Power believes that numerous findings of fact and conclusions of law of the Appeal Board memorandum decision in this proceeding dated December 30, 1977, (ALAB-452) were erroneous, and, in the absence of a settlement, Consumers Power would seek Commission and judicial review and reversal of that decision.

For their part, the Intervenors believe that the Ap-peal Board's decision of December 30, 1977, is fully supported by the record and they would urge its affirmance by reviewing authorities.

However, in recognition of the fact that adoption of these proposed license conditions will deny Consumers Power the opportunity to seek review and reversal of that decision, the Intervenors have executed an agreement with Consumers Power which, inter alia, releases Consumers Power from any antitrust claims arising out of the Appeal Board's decision.

In addition, Consumers Power and Intervenors have executed a Settlement Agreement which supplements, and in some instances expands upon, the provisions of the proposed license conditions.

Nothing in this Agreement reduces, or utherwise adversely affects, the rights, benefits, or entitlements of any party under,the proposed license conditions.

If the Board so directs, Consumers Power and the Intervenors will submit 1281

70

. copies of their Settlement Agreement or portions thereof,/ for 2

the Board's review.

Consumers Power and Intervenors strongly urge adop-tion of the proposed license conditions.

In our view, adoption

.of these license conditions will assure that Consumers Power's activities under the Midland licenses will not create or main-tain a situation inconsistent with the antitrust laws.

These license conditions will also provide the framework and founda-tion for future cooperative efforts which will serve the best interest of all lower Michigan electric utilities and their customers.

In short, although the proposed conditions are a product of compromise, Consumers Power and the Intervenors believe that the adoption and imposition by this Board of the proposed license conditions, as fully dispositive of all issues raised in this proceeding, would be just and reasonable and will fully serve the public interest.

WHEREFORE, Consumers Power Company and the Inter-venors move the Board for an order including the attached license

-2/

Those portiIons of the settlement dealing directly with Midland Units 1 and 2 include the following contract forms:

(1)

Ownership and Operating Agreement (215 pages).

(2)

Back-Up Requirements Agreement (37 pages).

(3)

Transmission Ownership and Operating Agreement

~

(102 pages).

1281

9:

4-conditions to the Midland construction permits in full dis-position of the above-captioned proceeding.

Respectfully submitted, lfa

? f l-p' n ic Jl's

.UMlS*.

Wm. Warfield Ross

',.,/

Keith S. Watson WALD, HARKRADER & ROSS Attorneys for Consumers Power Company f b.

Robert A. Jablon SPIEGEL &'McDIARMID Attorney for The Cities of Coldwater, Grand Haven, Holland, Traverse City, and Zeeland, the Northern Michigan Electric Cooperative, Inc., Wolverine Electric Co-operative, and the Michigan Municipal Electric Association 1281

:?

September 25, 1979 4

.m

UNITED STATES OF AMERICA BEFORE THE ATOMIC SAFETY & LICENSING BOARD NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

Docket Nos. 50-329A CONSUMERS POWER COMPANY J

50-330A

. Midland Plant, Units 1 and 2

)

CERTIFICATE OF SERVICE I HEREBY CERTIFY that copies of the Joint Motion of Consumers Power Company and Intervenors Supporting Imposition of License Conditions were served U*>on the following persons by deposit in the United States ma.1, first class mail postage prepaid, this 25th day of September, 1979.

Hugh K. Clark, Esquire Marshall E. Miller, Esquire Chairman, Atomic Safety Atomic Safety & Licensing and Licensing Board Board P.O. Box 127A Nuclear Regulatory Commission Kennedyville, Maryland 21645 Washington, D.C.

20555 Frederic D. Chanania, Esquire Dr. J.V. Leeds, Jr.

Nuclear Regulatory Conmission 10807 Atwell MNBB-9604 Houston, Texas 77096 Washington, D.C.

20555 Robert A. Jablon, Esquire Chase R.

Stephens, Chief Spiegel & McDiarmid Docketing & Service Branch 260') Virginia Avenue, N.W.

Office of the Secretary Washington, D.C.

20037 Nuclear Regulatory Commission Washington, D.C.

20555 John Whitler, Esquire Antitrust Division Melvin Berger, Esquire Department.of Justice Antitrust Division Washington, D.C.

20444 Department of Justice P.O. Box 14141 Washington, D.C.

20044

,b[5 fl ^f/

' // <.5

.s Wm. Warfield Ross Keith S. Watson Wald, Harkrader & Ross 1300 - 19th Street, N.W.

Washington, D.C.

20036 1281

?3

ATTACHMENT TO JOINT MOTION MIDLAND NUCLEAR POWER STATION, UNITS 1 AND 2 PROPOSED LICENSE CONDITIONS I,

DEFINITIONS 1.

J.s used herein:

(a)

" Licensee" means Consumers Power Com7any, or any successor or assignee of this licensee and includes each present or future subsidiary in which Licensee owns more than 50% interest and any successor thereto.

(b)

" Bulk power" means the electric power and attendant energy supplied or made available at trr.usmission or subtransmission voltage for resale.

(c)

" Neighboring entity" means a private or pub-lic corporation, a governmental agency or autnority, a municipality, a cooperative, or a lawful association of any of the foregoing, which is all or partially in Licensee's service area-(as defined below) and which meets each of the following criteria:

(1) its facilities, existing or pro-posed in the immediate future following a proposal for arrangements under these conditions, are economically and technically feasible of interconnection with those of the Licensee; (2).it owns and operates or proposes to own and operate electric generation, transmission or distribution facilities or has joint o'nership participation or contrac-w tual rights in generation, transmission or distribution facilities operated by others; and (3) with the exception of 1281

?!

~

generation and transmission cooperativer., municipalities, governmental agencies or authorities, and associations, it is, or upon commencement of operations, will be a public utility or cooperative and subject to regulation with respect to rates and service under the laws of the State of Michigan or under the Federal Power Act; provided, however, that as to associations, a majority of members of such. association is either a public utility or cooperative as discussed in this clause (3) or a cunicipality, governmental agency or authority.

(d) " Neighboring coordinating entity" means a " neigh-boring entity" which is currently planning its future bulk pcaer supply so that its " total generation capacity" (as definad below) will be at least equal to its projected peak load demand and reserve requirements established pursuant to Section 3(a) hereof.

Total generation capacity shall be calculated as the sum of the system's (1) native installed capacity, ( 2) formally executed bulk power purchases (in-cluding purchases under a wholesale tariff) from or arrange-ments with Licensee or other parties for periods of one or more six-month peak load seasons and (3) participation in generating units of Licensee or other electric systems.

An electric distribution system that satisfies its entire peak load demand with firm power purchases from another electric system (including an associacion of which it is a member) does not qualify as a neighboring coordinating

~

entity.

1281

7:

. (e) " Costs" means all appropriate costs, including a reasonable return on investment, which are reasonably allo-cable to an arrangement between two or more electric systems under coordination principles or generally accepted industry practices.

In determining costs, no value shall be included for loss of revenues from a sale of power by one party to a cusconer which another party might otherwise serve.

(f) " Net benefits" means that, for each party thereto, the benefits derived from an arrangemen: exceed its costs.

Receipt of compensation which covers Licensee's costs, in accordance with the applicable tariff or rats filed by Li-censee with a regulatory authority, or established by such au-thority pursuant to a final, non-appealable order, shall be deemed to provide Licensee with net benefits as te such arrange-ment; provided that Licensee shall not decline to enter into an arrangement during the pendency of administrative or judicial proceedings involving filings applicable to such arrangement.

Compensation under a tariff or rate applicable to a particular arrangement or a particular party shall not necessarily be deemed to provide net benefits as applied to different arrangements or different parties.

In calculating net benefits from a particular arrangement, Licensee shall also take account of value (positive or negative) other than compensation under a rate or tariff, including impact on system reliability and riske of forced outage.

1281

7:

. (g) " Integrated bulk power system" means the inter-connected generation, transmission and sub-transmission f a-cilities used to serve a system's principal load centers.

(h) " Licensee's service area" means all counties in Michigan's Lower Peninsula with the following exceptions:

(1) the entirety of the counties of Berrien, Cass, Euron, Lapeer, Macomb, Sanilac, St. Clair and Wayne, and (2) the townships in which Licensee is not franchised to provide electric service in the counties of Van Buren, St. Joseph, Monroe, Washtenaw, Oakland, Tuscola and Livingston.

II.

GENERAL PRINCIPLES 2(a) The arrangements described in the following sections shall be o'f the types, and pursuant to terms and conditions, which are consistent with good industry prac-tice.

The terms and conditions of any individual arrange-ment'shall be on a basis that will compensate Licensee for its costs incurred thereby.

No party shall be obligated to enter into an arrangement if on balance there does not ap-pear to be any demonstrable net benefit to such party arising from that arrangment.

It is recognized that, in any particular arrangement the net benefits may not be equal or identical for each party and that the net bene-fits of an arransement for a small system or for a system not theretofore engaging in such arrangements may be greater 1281

77 than that realized by a larger electric system or one already engaging in such arrangements.

The relative net benefits to be derived by the parties from a proposed arrangement shall not therefore affect a decision with respect to parti-cipating in any such arrangement, subject to the other terms and conditions of this license.

(b) Any neighboring coordinating entity entering into any arrangements provided for in these license conditions will be expected insofar as practicable and in accordance with good industry practice - taking into account laws, rules and other restrictions affecting taxation and financing - to grant recip-rocal rights and benefits to Licensee, and to undertake recip-recal obligations with respect to Licensee.

Nothing herein shall require a neighboring coordinating entity to construct generation facilities except where to do so is necessary to maintain its reserve obligations under Section 3(a) below.

(c) Interconnection, interchange of power, coordi-nation or other arrangements under this license shall be re-quired only if such arrangements would not adversely affect Licensee's system operations or the reliability of power sup-ply to Licensee's customers or other electric systems with whom it has prior contractual commituents, and if such ar-rangements would not jeopardize Licensee's ability to finance or construct on reasonable terms f acilities needed to meet its 128I l '; '

. own anticipated system requirements, including the sale of firm bulk power pursuant to Section 11(a) hereof.

(d) The following conditions shall be implemented in a manner consistent with the provisions of the Federal Power Act and other applicable regulatory statutes, regula-tions and orders.

All rates, charges or practices in connec-tion with any action taken by Licensoe pursuant to this li-cense, which are subject to the jurisdiction of a regulatory agency, are subject to the approval of that agency.

Nothing in the foregoing shall be cor.atrued to waive any of the Li-censee's rights or protection afforded by law with respect to the retail distribution of electricity in those areas of Michi-gan in which it transacts local business.

Licensee shall not be required to enter into any final arrangement prior to reso-lution of any substantial questions as to the lawful authority of another party to engage in the arrangement.

(e) If Licensee participates in any of the following arrangements with an association of electric systems, Licensee shall not be obligated to take account of requests or require-aents of members of that association which do not qualify as a " neighboring entity", as defined in section 1(c) hereof.

(f) Agreements implementing the following sections, shall not impose limitations upon the use or resale of capacity and energy after delivery to a neighboring entity, except as may be necessary to protect the reliability of Licensee's

~

system.

1281

??

(g) Licensee shall also negotiate in good faith interconnection and other appropriate agreements with a neighboring entity which has bona fide plans to become a neighboring coordinating entity in the immediate future so as to permit such entity the opportunity to participate in arrangements described in the following sections as soon as it becomes a neighboring coordinating entity.

(h) The obligations set forth in the following sections shall be governed by conditions and limitations set forth' in this section.

III.

COORDINATED OPERATIONS 3.

Obligation to interconnect and share reserves (a) Licensee shall interconnect and enter into appropriate coordination agreements with a neighboring coordi-nating entity which so requests and operate normally in parallel in accordance with good operating practice, provided that a reciprocal plan of reserve sharing is agreed to by a neighboring coordinating entity as provided herein.

Licensee and such entity shall jointly establish and separately maintain the minimum reserves to be installed or otharwise provided under such a plan in accordance with good industry practice.

Further, under such a plan, Licensee shall not be obligated to agree that a party may maintain a minimum reserve percentage less than Licensee 's own reserve percentage.

The reserve re-quirement thus established shall be calculated as a percentage of peak load demand (adjusted for firm power purchases and sales) 1281 200 except as provided herein, no party to the interconnection shall be required to maintain as its reserve requirement more than such,,sreentage of peak load demand.

If the rescrvu require-ments of any party to a reserve sharing plan under this para-graph are increased over and above the amount such party would be required to maintain without such interconnection, then the other party shall be required to carry or provide for its re-serve responsibility the full amount in kilowatts of such in-crease.

If over a reasonable period one system demands emer-gency support from the other to a disproportionately greater ex-tent than the system delivers such support, by reason of the unf avorable reliability experience of the receiving system's generation or transmission facilities, the receiving system shall take all reasonable steps to avoid such demands (e.c.,

by purchasing capacity and energy other than emergency energy, or other reasonable steps).

Each party to any such recipro-cal plan shall maintain such amounts of operating reserves as may be consistent with good industry practice and adequate to avoid the imposition of unreasonable demands on either party in meeting the reasonable contingencies of operating its own system.

However, in no circumstances shall a party's opera-ting reserve requirement exceed its installed reserve requirement.

(b) Interconnections with neighboring coordinating entities shall not be limited to lower voltages when higher voltages are requested and available from installed facilities 1281 20:

of the party to whom the request is made in the area where the interconnection is desired.

Each party shall maintain control and metering facil11 ties as required for safe and pru-dent operation of the interconnected system in accordance with good industry practice.

(c) The cost of interconnection facilities between Licensee and another system shall be allocated in a manner which takes account of the various transactions for which the interconnection f acility is to be utilized.

(d) Except as provided in Section 10(a) infra, interconnections shall be made to the integrated bulk power systems of each entity.

Any party may require that the trans-mission f acilities between the interconnected parties meet reasonable protective standards to avoid credible contingen-cies cascading to areas outside of each party's system.

(e) Interconnection agreements shall not prohibit neighboring coordinating entities f rom entering into other interconnection agreements, but may include appropriate pro-visions to protect the reliability of Licensee's system, and to insure that Licensee is compensated for additional costs resulting f rom such other interconnections.

4.

Obligation for reciprocal sales of emergency p owe r.

Licensee shall exchange emergency power with neigh-boring coordinating entities which so request.

Licensee shall be required to engage in such transaction if and when 1701 oqq ILOI

.. v

it has power and energy available for such transactions from its own generating resources or from interconnected systems but only to the extent that it can do so without impairing service to its customers or other electric systems with whom it has contractual commitments, 'provided, however, emergency service shall take precedence over any sales of economy energy.

5.

Obligation to coordinate maintenance scheduling and for purec ases and sales of maintenance power and energy.

Licensee shall exchange joint maintenance schedules and shall engage in purchases and sales of maintenance power and energy with any neighboring coordinating entity which so requests when it can reasonably do so.

After agreement to each such transaction, power shall be supplied to the fullest extent practicable for the time scheduled and in accordance with generally accepted industry practice for maintenance power and energy sales.

6.

Obligation to engage in sales of economy energy.

Licensee shall exchange data on costs of energy f rom-generating resources available to it and, consistent with sys-tem security sell to, purchase from, or exchange economy energy when appropriate to do so under principles of economic dispatch with a requesting neighboring coordinating entity on a basis that will apportion the savings from such transactions equally between Licensee and such entity.

7.

Obligation to sell, purchase or exchange other non-firm surplus capacity and energy associated therewith.

1281 20

Licensee shall sell to, purchase from or exchange with any neighboring coordinating entity other non-firm bulk power which the supplying system deems to be surplus, when such transactions would serve to reduce the overall costs of bulk power supply without a loss to either party.

Such bulk

~

power transactions shall be on terms and conditions consistent with generally accepted industry practice.

8.

eciprocal Performance With regard to transactions in emergency and main-tenance power, economy energy and other non-firm surplus capacity-energy, as set forth in Sections 4, 5, 6 and 7 above, other parties to such transactions shall maintain (and ade-quately plan to provide) bulk power supply facilities and capabilities sufficient to reasonably assure Licensee that reciprocal performance will be forthcoming.

Reciprocal per-formance requires plans and bona fide effo'ts necessary to r

maintain the established reserve levels under the coordina-tion arrangement.

Temporary short-falls in meeting this requirement due to circumstances beyond a party's control would not provide a basis for the other party's failure to perform in bis regard.

Reciprocal performance does not necessarily require that neighboring coordinating entities supply Licensee with the same amounts of power or energy

'which they receive from Licensee.

1281 IV.

ACCESS TO NUCLEAR GENERATION 9(a)

Licensee shall, upon timely request, afford any neighboring entity an opportunity to participate in Midland Units 1 and 2.

Licensee shall, prior to the time major equip-ment items for nuclear generating units are ordered, upon re-quest by any neighboring entity, afford such entity an opper-tunity to participate in all future nuclear generating units for which Licensee applies for a construction permit on or be-fore December 31, 1999.

Participation shall be through rea-sonable joint ownership or other joint financing arrangements in which the participating neighboring entities pay their share of costs of construction approximately (but no later than) as they are incurred by Licensee.

The form of such participation in such generation units shall k'

at the option of the parti-cipating entity to the extent that such an entity is legally able to participate in the unit under such a form of partici-pation.

Such participation shall be on reasonable terms and conditions and on a basis that will compensate Licensee for its costs incurred and to be incurred for such generating units; p rovided, the aggregate participation of others in any nuclear unit shall hot be required to exceed the lower of 49% of the capacity of such unit or an amount based upon a ratio of (i) most recent aggregate peak loa.d d2 mand of requesting participants to (ii) the sum of such demands and Licensee's most recent peak load demand (less the most recent peak load demands on Licensee by the requesting participants.)

1281 205 A request from a neighboring entity fer participation in Midland Units 1 and 2 shall be deeme3 timely only if a letter of intent to participate (subject only to financing contingencies) is executed by the governing body of the participating entity and received by Licensee within

~

a mutually agreeable time period following the effective date of thvise license conditions.

As to future nuclear units it plans to construct, other than Midland Uni ts 1 and 2, Licensee shall provide to requesting neighboring en-tities all available financial and technical data required to assess the feasibility of participation therein.

A request for such participation shall be deemed timely only if a letter of intent to participate (subject only to financing contin-gencies) is executed by the governing board of the participat-ing entity and received by Licensee within six months follow-ing Licensee's provision of such data.

A neighboring entity's participation request in a nuclear unit shall also be deemed timely only if it executes a legally binding and enforceable agreement with Licensee to assume financial responsibility for its share of the costs associated with a unit within one year af ter execution of such letter of intent.

~

(b)

As a part of any arrangement that may be reached with respect to any participation under subsection 9(a) above, Licensee shall interconnect with and deliver to the integrated bulk power system of a participating neighboring entity any power to which it may be entitled under such arrangement at a 1281 20.

delivery point or points on Licensee's system on a basis that will _ compensate Licensee as provided in Section 10(b) infra.

(c)

Licensee, as long as it maintains majority own-ership, may exercise final authority in all decisions neces-sary in accordance with good industry practice in the engineer-ing, design, construction, operation, maintenance and schedul-ing of a nuclear generating unit where a joint ownership or joint financing arrangement is entered under subsection 9(a).

An advisory committee shall be organized properly to consider the needs and desires of each party thereto.

(d)

In the event that one or more neighboring en-tities choose to obtain majority ownership in any nuclear unit, Licensee shall be affcrded the opportunity to participate in such unit under comparable terms and conditions as those de-scribed in subsection.9(a).

Nothing in these License Condi-tions shall require any party to enter into a nuclear unit joint venture where to do so would cause loss of tax-exempt statuc or otherwise significantly increase the tax liabilities of such party.

V.

TRANSMISSION SERVICE 10(a)

Licensee shall facilitate bulk pcwer trans-actions between two or more neighboring entities by providing transmission service between or d.mong the integrated bulk power systems of such entities or to such integrated bulk power systems f rom the generation facilities of such entities.

~1 2 8 1.T 0 7

. Licensee shall also provide transmission service for bulk power transactions over its ansmission f acilities between the integrated bulk power system of any neichboring entity and any electric system engaged in bulk pc

- 7sactions which is outside Licensee's service area.

Licensee shall pro-vide transmission service under this paragraph only if (1)

Licensee's and other connected transmission lines form a con-tinuous electric path between the supplying and the recipient systems; ( 2) permission to utilize other systems' transmission lines has been obtained by the proponent of the arrangement; (3) the services can reasonably be accommodated f rom a func-tional technical standpoint without significantly impairing Licensee's reliability or its use of transmission facilities; and (4) reasonable advance taquest is received from the neighboring entity seeking such services to the extent that such notice is required for operating or planning purposes.

(b)

Licensee's provision of transmission services under this section 10 shall be on a basis which compensates it for its costs of transmission reasonably allocable to the service or on another mutually agreeable basis and in accor-di :ce with a' reasonable transmission agreement.

Licensee shall file tariffs providing for transmission services required to i tplement these license conditions with the Federal Energy Regulatory Commission or its successor agency.

Noching in this license shall be construed to require Licensee to wheel 1281

.:0?

. power and energy to oc from a retail customer.

Each neighbor-ing entity to whom Licensee provides transmission services here-under shall be expected to provide transmission services to Licensee under comparable terms and conditions, to the extent it has transmission facilities available to do so.

Licensee shall keep requesting neighboring entities informed of its transmission planning and construction programs and shall in-clude therein sufficient transmission capacity as required by such entities, provided that such entities provide the Licensee sufficient advance notice of their requirements.

However, Li-censee shall not be required to construct any transmission facility (1) which will be of no demonstrable present or future electrical benefit to Licensee, (2) which would jeopardi=e Li-censee's ability to finance or construct, on reasonable terms, facilities to meet its own anticipated system requirements or to satisfy existing contractual obligations to other electric systems, or (3) which could reasonably be constructed by the requesting entity without duplicating any portion of Licensee's transmission system.

In such cases where Licensee elects not to construct transmission f acilities, the requesting system shall have the option of constructing and owning such f acili-ties and interconnecting them with Licensea's facilities.

1 2 8 1

.~2 0 ?

17 -

VI.

OBLIGATION TO SELL FIRM BULK PORER 11(a)

Upon timely request, Licensee shall intercon-nect with, execute appropriate agreements with, and sell firm bulk power under tariff provisions filed with the Federal Energy Regulatory Commission or its successor agency to any neighboring entity (i) which was a wholesale customer of Licensee on the effective date of these license conditions and (ii) which is not a party to a coordination agreement with Licensee, up to the amount required to supply electric service to the retail customers or the retail load of distributing cooperatives (located in Licensee's service area) which are supplied by such neighboring entity.

(b)

Upon timely request, subject to the terms of subsection 11(c) hereof, Licensee shall sell firm bulk power to neighboring coordinating entitit.s to which Licensee is not selling bulk power under subsection 11(a) hereof; provided, however, that the purchasing entity agrees to sell such firm bulk power as it has available to Licensee under comparable terms and conditions.

Nothing shall require Licensee to sell firm bulk power under the preceding sentence in amounts which exceed the purchasing entity's an-nual peak load demand and reserve requirements minus its total generating capacity (other than firm bulk power purchases from Licensee), as defined in paragraph 1(d) hereof, at the time of the sale.

As used in this subsection (b), " peak load" shall mean the greatest previously experienced load 1281

.?

?

. plus estimated load growth attributable to the retail customers or the retail load of distribution cooperatives (located in Licensee's service area) to the extent that such load and load growth are supplied by the purchasing entity in question for periods of requested purchases.

(c) Licensee shall keep requesting neighboring enti-ties informed of its generation planning and construction pro-grams.

Licensee shall include in such planning and programs sufficient generation capacity to satisfy requests for firm bulk power from a system which was a wholesale customer of Licensee on the effective date of these license conditions.

Licensee shall not be required hereunder to construct generation f acilities or advance generation schedules to satisfy bulk power requests of a system which was not a wholesale customer of Licensee on the effective date of these license conditions.

(d)

As used in this paragraph, "vholesale customer of Licensee on the effective date of these license conditions" shall include a neighboring entity which is formed in the future whose load includes load served at retail by Licensee immediately prior to its formation (hereinafter a "New Neighboring Entity"); provided, however, that when the total load of a New Neighboring Entity also includes load served at retail by an entity other than Licensee immediately prior to its formation, Licensee shall only be required to sell firm 128i.1:

,19 -

bulk power under this paragraph in an amoun* equal to the load in kW served at retail by Licensee during the year im-mediately prior to the New Neighboring Entity's formation, plus the growth of retail load experienced in the geographic area previously served by Licensee.

(e)

Firm bulk power sales under this paragraph shall not be limited to lower voltages when higher voltages are re-quested and available from Licensee in the area where the inter-connection is desired.

VII.

ACCESS TO POOLING ARRANGEMENTS 12.

Licensee shall not oppose the membership of a neighboring coordinating entity in any pooling or coordination arrangement to which Licensee is presently a party, or within the term of this license becomes a party; provided, however, that the entity satisfies membership qualifications which are reasonable and do not constitute undue discrimination.

To the extent that Licensee enters into pooling, coordination or similar joint bulk power arrangements during the term of the license, it shall use its best efforts to include provisions therein which permit requesting neighboring coordinating en-tities the opportunity to participate in the arrangement on a

~

basis that is reasonable and which do not constitute undue discrimination.