Responds to IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. No Connections Have Ever Existed Between low-rated Transformers & high-rated Emergency Diesel Generators
ML19254E428
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/15/1979
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
LAC-6579, NUDOCS 7911010089
Download: ML19254E428 (2)


Text

T}

~

DAIRYLAND POWER COOPE2tATIVE Sa Groue, QYisconsin 54601 October 15, 1979 In reply, please refer to LAC-6579 DOCKET NO. 50-409 Mr. James G. Keppler, Director U.

S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 IE BULLETIN NO. 79 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER I

Reference:

(1)

NRC Letter, Keppler to Linder, dated September 12, 1979.

Dear Mr. Keppler:

Your letter (Reference 1) requested a determination to insure no electrical connection exists between the neutral circuit of the primary windings of the EPT or CPT and the generator neutral.

We have inspected the lA and 1B Diesel Generators and have determined that no connections have ever existed between low KVA rated trans-formers and high KVA rated EDG's at the LACBWR facility.

The neutral connections were always in a " floating" mode.

Diesel Generator lA was tested with a 225 KW load for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on September 11, 1968.

The IB Diesel Generator was tested with a 300 KW load on July 21, 1976.

Diesel Generators lA and 1B were tested with full emergency loads for 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> on September 6, 1979.

No overheat or other operational problems were noted.

If you have any questions regarding this letter, please contact us.

Very truly yours, DAIRYLAND P COOPERATIVE C

~

Frank Linder, General Manager FL:WRN:af 1283 960 r

_1_

DCT 22197g 7911010 @

. -...,,.. =

Mr. James G. Keppler, Director LAC-6579 U. S. Nuclear Regulatory Commission October 15, 1979 cc:

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D. C.

20555 1283 961 t

L 2-g ee w

e.

mawa-**

  • =ewww-g

.e

.g_

wpa

_w eh%..