Discusses Status of Proposed Control Bldg Mods Safety Evaluation.Sections Re Operation During Mods,Except Parts Concerning Unresolved Structural Questions,Are Completed & Undergoing Final Review
ML19254E367
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/21/1979
From: Gray J
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Mccollum K, Miller, Paxton H
Atomic Safety and Licensing Board Panel
References
NUDOCS 7910310508
Download: ML19254E367 (1)


Text

_ _.

p* ** %

.P UNITED STATE"

[

. j.' j NUCLE AR REGULATORY COMMISS!ON

}

7

^ 3 #7 j

WASHING TO.% D. C. 20555

-i r

~,%'

%' i l

~

f?

1 *....$

peCOM September 21, 1979 Marshall E. Miller, Esq., Chairman Dr. Kenneth A. McCollom, Cean Atomic Safety and Licensing Goard Division of Engineering U.S. Nuclear Regulatory Corlissior.

Architecture & Technoicgy Washington, DC 20555 Oklahoma State University Stillwater, CK 74074 Dr. Hugh C. Paxton 1229 41st Street Los Alamos, i:M 87544 In the Matter of Portland General Electric Company, et al.

(Trojan Nuclear Plant)

Docket No. 50-344 (Control Building)

Gentlemen:

On September 6, 1979, the NRC Staff filed a motion to postpone the scheduled hearings in Phase II cf the referenced proceeding because the Staff was un-able to issue its Safety Evaluation Report (SER) on the proposed Ccntrol Building modifications.

In that. motion, tne Staff indicated that it would provide to the Licensing Board,and parties w:ekly reports on,the status of resolution of the open items and completion of the SER.

i On September 10, 1979, additional questions related to embedment of Nelson Studs, shrinkage strains and the method of calculating stresses from shrinkage in existing and new walls, the structural adequacy of rigging used in steel plate handling, and coefficients of friction between installed steel plates and concrete were telecopied to the Licensee.

Intense evaluation of the structural adequacy cf the proposed nodification has continued in order to resolve all remaining unresolved areas and to assure that all unresolved questions are fully identified and transmitted to the Licensee. Inose sections of the SER addressing operation'during the codifications, except for certain parts related to unresolved structural questicns, have been ccmpleted and are undergoing final review.

Sincerely, n0

/'

1 ?

p

,.-j q ;; n j== y

./Uospph R. Gray

/

  • Counsel for NRC Staff cc:

Em icc u r.

CO3 7 910310 a 4

346