ML19254D863
| ML19254D863 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 10/22/1979 |
| From: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Rubenstein L Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19254D864 | List: |
| References | |
| NUDOCS 7910300268 | |
| Download: ML19254D863 (1) | |
Text
-
f.
Am v is. t-e.
t g,g & !
, i.
g, i. 7 g,5< l. lJ-7' t r' i
e
,, +-.
<s-g n g4 9 se r
e.-
I-t 6 Lt;
. J}
L.
/
It iJ 4
L. % A lid e
y.
I Ii4
>6 i
s Id
-f L. '. s 4
ILLUMINATING BLDG, a PUBLIC SQUARE e CLEVELAND cHIO 44101 e TELEPHONE (216) 623-1350 e Mall ADDRESS:
P. O. BOX 5000 Dalwyn R. Davidson VICE PRESIDE NT SYSTEM ENGINEER NG AND CONSTRUCTION October 22, 1979 Mr. L. S. Eubenstein, Acting Chief
!.ight Water Reacters Branch ?io. L Dire.ctor of ::aclear Eeactor Regulation Division of Project Management S. I!uclear Regulatory Co: ission u.
~hshington, D. C. 20555 Fe:
Ferry ?!uclear Power Plant Docket Iscs. 50 bh0; 50 h41 3edrock Deformation in the Perry Intake and Discharge Tunnels D=ar Mr. Pubenstein:
~.clcsed is a report prepared by our consultants, Gilbert Associates, Inc.,
entitled, "Fedrock Tefermation in the Cccling Water Tunnels, Ferry :?uclear Taver Fla:t. ::crth Perry, Ohio." dated October 1979 Tnis is our final report on the bedrock defor:1 tion in which a complete discussion of our
- nvestigations and the work done by independent consaltants are presented.
ire concur with our consultants' cenclusiens that the deformation is ncn-tectenic in origin and is not a capable fault as defined in 10 CFR 100.
Tne results presenttd in the report confirm the earlier conclusionc that t> e fennding bedrcck is suitable for the constructicn of the Ferry liuclear N wer F1 ant.
Very truly yours,
^
r j'h,*w.4y" sk %.s.
W-d Dalyyn P. Davidsen Vice Fresident Systen Engineering and C.
ruction WD/cn-