ML19254D788

From kanterella
Jump to navigation Jump to search
Application for Amend of Licenses DPR-44 & DPR-56 to Reflect Removal of Certain Shock Suppressors from Each Unit. Certificate of Svc & Filing Fee Encl
ML19254D788
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/24/1979
From: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19254D787 List:
References
NUDOCS 7910300147
Download: ML19254D788 (8)


Text

. .

BEFORF. THE UNITED STATES NUCLEAP REGULATORY C OM?lI S S IO N In the Matter of Docket Nos. 50-277 P H IL AD EL Pili A ELECTRIC COMPANY  : 50-27' APPLICATION FOR AMENDHENT OF FACILITY OPEr\ TING LICENSES ,

DPR-44 5 DPR-56 Edward G. 15 a u e r . .! r .

E u r,e n e J. !5radley 2301 Market Street Philadelphia, Pennsylvania 19111 Attorneys for Philadelphia Electric Compar 1 ") ,

yn 701030014-7

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of  :

Docket Nos. 50-277 PHILADELPlilA ELECTRIC COMPANY  : 50-278 APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Philadelphia Electric Company, Licensee under racility Operating License DPR-44 for Peach Bottom Atomic Power Station Unit No. 2 and Licensee under Facility Operating Licensee DPP-56 for Peach Bottom Atomic Power Station Unit No. 3, hereby requests that the Technical Specifications contained in Appendix A of the Operating Licenses be amended to correct an administrative oversight in a previous amendment request by deleting from Table 3.II.D.1 anubbers 3-HC-S-1 and 3 -!! C - S - 2 for each unit. The 4 g e .,

Iau a

revisions are indicated by vertical bars in the right nargin of the attached copies of page 2341 for Units 2 and 3 The snubbers are located on a p ot tien of the CRD return line. They have been physically removed on Unit 3 during the current refueling and maintenance outage and are scheduled to be removed on U rs i t 2 during the 1980 Spring refueling outage as part of a modification to the CRD return line that has been reviewed and approved by the Nuclear Regulatory Commission in Technical Specification Amendments Nos. 60 to the Peach Bottom Units 2 and 3 Operating Licenses. It is therefore requested that Unit 3 snubbers 3-llc-S-1 and 3-HC-S-2 he deleted from Table 3.11.D.I.

Since the CRD modification to Unit 2 will not be p e r f ormed until after these Technical Specification changes have been approved, it is requested that deletion of Unit 2 snubbers 3 -II C - S - 1 and 3-IIC-S-2 he raa d e effective upon completion of the CRD modification.

Since the proposed changes to the Technical Specifications are administrative in nature, pursuant to 10 CFR 170.22. Philadelphia Electric Company, for fee purposes, proposes that the Application for Amendment for Unit No. 2 he considered a Class II Amendment and that the Application for Amendment for Unit 3 he considered a Class I Anendment.

't *

  • 7'

't ,

The Plant Operation Review Committee and the Operation and Safety Review Committee have reviewed these proposed changes to the Technical Specifications and have concluded that they do not involve an unreviewed safety question or a significant hazards consideration, and will not endanger the health and safety of the public.

Respectfully submitted, PIIIL AD ELPilI A ELECTRIC COMPANY f,

.'Vwi c'euPrxsident n w! = ....

]'i" 7-

.i I S 6051!!ON'iEALTH O F PENNSYLVANIA -

as.

COUNTY OF PilILADELPHIA -

S. L. Daltroff, being first duly sworn, deposes and says:

That he is Vice President of Philadelphia Electric Company, the Applicant herein; that he har read the foregoing Application for Amendment of Facility Oper.61ng Li.:enses and knows the contents thereof; and that the s t: a t e m e n t s and matters set forth therein are true and correct to the best of his knowledge, information and belief.

_. .( 72. L b_-

I---......-

/

Subscribed and s w re r n to before me thisc2 da,y l j .] f 7 l',

of N

~

c- ~

~

[o 'aiy~ ~P u E1 i :

L EllZABETH H. BOYER Mtary Pubfic. Phifa., Phila, Co,

,f

/ Commission Evpires Jan. 30.1962

CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Board of Supervisors, Peach Bottom Township, York County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Albert R. Steele, Chairman of the Board of Supervisors, R. D. No. 1 Delta, Pennsylvants 17314; upon the Board of Supervisora, Fulton Township, Lancaster County, Pennsylvanin, by mailing a copy thereof, via first-class mail, to George K.

Brinton, Chairman of the Board of Supervisors, Peach Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore T ow n sh i p , Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Uilmer P. Bolton, Chairman of the Boord of Supervisors, R. D. No. 1 Holtwood, Pennsylvania 17532: all this 24th day of October, 1979.

-.m I l

~ } ~ ~ .p . /

V J.

a. . . . . . . .

~.

  • Eugene J. Bradley A t-t o r n e y for Phil.3delphia Electric Company

) ,

- .y,

PBAPS '

TABLE 3.ll.D.1 Safety Related Shock Suppressors (Snubbers)

SNUBCERS SNUBBERS SNUBBER IN HIGH(1) SNUBBERS INACCESSIBLE ACCESSIBLE SNUBBER RADIATION AREA ESPECIALLY DURING NORMAL DURING NORMAL NUMBER LOCATION ELEVATION DURING SHUTDOWN DIFFICULT TO REHOVE OPERATION OPERATION Unit 2 (Cont'd)

Control Rod l

H-3LS-142-1 Drive Supply 145 See 4.ll.D.4.b D rywell Bundles Control Rod b H-3LS-142-2 Drive Supply 145

" D rywell U Bundles I

Control Rod H-3LS-142-3 Drive Supply 145

" D rywell Bundles Control Rod H-3LS-142-4 Drive Supply 145

" Drywell Bundles Control Rod

'I-3 L S- 14 2-5 Drive Supply 145

" D rywell rl '

~'

Bundles Control Rod H-3LS-142-6 Drive Supply 145 Drywell "wJ ta Bundles Control Rod H-3LS-142-7 Drive Supply 145 Drywell Bundles

PBAPS TABLE 3 11.D.1 Saf_ety Related Shock Suppressors (Snubbers)

SNUBBERS SNUBBERS SNUBBER IN HIGH(1) SNUBBERS INACCESSIBLE ACCESSIBLE SNUBBER RADIATION AREA ESPECIALLY DURING NORMAL DURING NORMAL NUMBER LOCATION EL DURING SHUTDOWN DIFFICULT TO REMOVE OPERATION OPERATION TEVATICN Unit 3 (Cont'd)

H-3LS-142-1 CRD Supply 145 See 4.11.D.4.b Drywell Bundles H-3LS-142-2 CRD Supply 145

" D rywell Bundles r%

$ H-3LS-142-3 CRD Supply l 'i 5 D rywell I Bundles H-3LS-142-4 CRD Supply 145 Drywell Bundles H-3LS-142-5 CRD Supply 145 D rywe ll Bundles H-3LS-142-6 CRD Supply 145 Drywell Bundles

--*H-3LS-142-7 CRD Supply 145 Drywell Ia Bundles H-3LS-142-S CRD Supply 145 Drywell Bundles sq Feedwater X Drywell 3 6-DDNL-S-5 169

" Drywell 6-DDNL-S-6 Feedwater 163 X