ML19254D580

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-0033/79-07 on 790611-15.No Noncompliance Noted.Major Areas Inspected:Facility Organization,Facility Operation,Storage & Internal Control of Records & Repts. Details Withheld (Ref 10CFR2.790)
ML19254D580
Person / Time
Site: 07000033
Issue date: 08/31/1979
From: Cohen I, Joyner J, Zibulsky H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19254D577 List:
References
70-0033-79-07, 70-33-79-7, NUDOCS 7910290105
Download: ML19254D580 (1)


Text

-

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 70-33/79-07 Docket No. 70-33 License No. SNM-23 Safeguards Group 1 Licensee:

Texas Instruments 34 Forest Street Attleboro, Massachusetts 02703 Facility Name:

Texas Instruments, Inc.

Inspection at:

Attleboro, Massachusetts Inspection conducted:

June 11 15, 1979 Date of Last Material Control and Accounting Inspection: March 22, 1979 Type of Inspection:

Unannounced Material Control and Accounting Inspectors:

2ds/sd_,

N 8-5/-77 H. Zibulsky, Ch6jnist/ N date signed

(( /bl$ h,WW P..z V - 7 7 A. Della Ratta, Auditor date signed

_)\\

2 - M-7 4 I. Cohen, Chemist date signed Approved by:

d 8 - af 79 be /H. ~ J Y er,/ Chief, Nuclear Material A.

date signed ntrol upport Section, Safeguards Branch Inspection Summa y:

Inspection on June 11-15, 1979 (Report No. 70-33/79-07)

Areas Inspected:

Facility organization, facility operation, storage and internal control, records and reports, management of materials control system.

The inspectior. involved 81 inspector hours onsite by three regional based NRC inspectors arid was begun during the regular hours.

Results:

The licensee was found to be in compliance with NRC requirements in the five areas examined during the inspection.

1221 307 Region I Form 166 j g[

(August 1979) 7910290 11