ML19254D488

From kanterella
Jump to navigation Jump to search
Interim Rept Re Impact Testing of Itt Grinnell-supplied Main Feedwater Pipe.Results of Heat Testing Expected by 790912.Final Rept Scheduled for 791008
ML19254D488
Person / Time
Site: Midland
Issue date: 09/07/1979
From:
BECHTEL GROUP, INC.
To:
Shared Package
ML19254D484 List:
References
MCAR-29, NUDOCS 7910260034
Download: ML19254D488 (2)


Text

. .

Attach =ent 1 Hove-2L2-79

/- Bechtel Associates Professional Corp, oration SUMECT: HCAR 29 (issued 8/31/79)

Impact Testing of Main Feedwater Pipe INTERIM REPORT 3 PROJEC*: Consumers Pouer Conpany 7003 DDN Midlaac Plant Units 1 & 2 Bechtel Job 7220 Status of Corrective Act!.on and Investigation The status of actions in progress for resolution of the subj ect MCAR is as follcus.

1) Bc'chtel has received from Crinnell a graph verifying that scmples taken frem Heat N-32762 speol 1-EL3-2S$38-13-2 CO-4-11) uere not in the heat-affected :ena of the bend. Therefora .it-is concluded that icw Charpy values were the result of material inconsistency for this specific spool and a generic concern for hot band sections of pipe Paving poor Charpy characteristics is el1=inated.
2) As stated previcusly in Interi= paport 1, 3echtel hcs determined that the mini =um service tempcracure for the appliccble spools is

, 707. n erefore, Grinnell has submitted and Ecchtel has cpproved a supplier deviatica disp:sition request (SODR) for the following spools ,frca Heat U-32752 which raises the minf-am Charpy test temperature from 3CF to 70F.

Scool Rezister .

lEL3-15-633-13-3 MP-4-3 lEL3-25-633-13-3 MP-4-12 1ELB-25-638-13-4 M2-4-13 lEL3-2S-633-13-5 12-4-l'.

1ELB-2S-633-13-6 MF-4-15 2EL3-lS-639-13-2A MR-4-15A 2EL3-15-639-13-3A 12-4-lGA 2 ELE-1S-639-13-3 MR-4-16 2ELn-2S-639-13-3 P2-4-24 2 ELD-2S-639-13-4. 12-4-25 e #

Gff

y 7 9102 60 Oj? $

ese-v- "quP"88**E'*M' M-' *NM *N-*N*+ *"M6' ** W 4

Bechtel Associates ProfessionalCorporation MCAR 29 Interim Repart 3 j HS Page 2 The one hot bend spool associated with this heat, spool 1-EI.3-2S-638-13-2, which had previously been identified in Interic Report 2 will be replaced. This particular spool is being replaced due to its unifornally lov Charpy test results even though all spools associated with Heat :;-32762 would be considered qualified by code as result of Crinnell's acceptable tests at a revised service tenperature of 707.

3) Based on Grinnell's conclusien stated previously in Interim Report 2 Crinnell is in the process of retesting heat L-20479 at 70F and will submit en SDDR upon successful completion of the testing.

Test results are e.g ceted frea Crinnell b/ Sopec=ber 12, 1979, and will be reported in the next MCAR report. -

Due to the pending disposition of Heat L-20479 the reportable condition of pipe remains uncertain at this ti=e.

Forccast Data f or Investication and Corrective Action .

The final report is scheduled for Octcba S,1979, s Submitted by: >[ s /

/

Approved by: 4'O I'r.Su'4/ ~

Concu rence by: '-/Y >

./e< , ./ 'e < y , . .

.. f F)CI/j s 8/31/1

[

'^'9'037 eW

- . 4,* p p . ,

"" * *****-as ** =e- m .,

W e - -

+Me +- e +gP_- - _ ,mer