)j $" "Og'o UNITED STATES
[ y,,,, +' 'g NUCLEAR REGULATORY COMMISSION W
..C WASWNGTON, D. C. 20555
- .;%@iEL s
i f
Mr. J. M. Pilant, Director Licensing & Quality Assurance fiebraska Public Power District Post Office Box 499 Columbus, fiebraska 68601 Mr.'G. D. Watson, General Counsel Nebraska Public Power Distr'.ct P. O. Box 499 Columbus, liebraska 68601 Mr. Arthur C. Gehr, Attorney Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Cooper fluclear Station ATTri:
Mr. L. Lessor Station Superintendent P. O. Box 98 Brownville,fiebraska 68321 1
Auburn Public Library 118 - 15th Street Auburn, liebraska 68305 Docket File V. Noonan NRC PDR G. Knighton Local PDR D. Ziemann P. Check ORB!3 Rdg NRR Rda G. Lainas H. Denton D. Davis F. Case F. Pagano D. Eiserbut R. C1 ark e
OELD U[ GH osIli OI&E (3)
Ga R. Voilmer S. Sheopard s
L Shac Project Manacer J[ Miller ACRS (16).
1210 001
,jRCParticipants l
T. Iopciito R. Reid I' R^
A. Sch.sencer J. R. Euchanan 7910250
,pn arco S.
UNITED STAT 2s 5
'n NUCLEAR REGULATORY COMMISSION
$ -[%,,, 7. f /
,5
?
WASHINGTON, D. C. 20555 E M 4[/
OCTOBER 19 MS Docket No. 50-298 LICENSEE:
Nebraska Public Power District FACILITY:
Cooper Nuclear Station SUMARY OF MEETING HELD OCTOBER 11, 1979 WITH NES: 'KA PUBLIC POWER DISTRICT ON APPENDIX I On October 11, 1979, members of the staff met with representatives of Nebraska Public Power District (NPPD) in Bethesda, Maryland.
The meeting was held for the purpose of discussing questions that had arisen during the review of NPPD's Appendix I submittal.
A list of attendees is attached.
NRC review and spot check of the Offsite Dose Assessment Manual (ODAM) showed certain differences in the NRC and licensee results.
Because licensee results were conservative they were regarded as acceptable.
Comments and questions on the NPPD proposed Appendix I Technical Specifications were discussed point by point.
In several instances difficulties arcse because of the need for consistent Technical Specification definitions for " operational" equipment encompassing t,oth reactor safety equipment and radiological monitoring equipment needed,for Appendix I.
NPPD was infomed that sample locations could be specified in the ODAM thereby avoiding time-consuming Technical Specification changes when local conditions require relocation of sample points.
NPPD will revise and resumit their proposed Appendix I Technical Specifications.
NPPD stated their intention to provide a proposed " alternative method" for demonstrating compliance with 40 CFR Part 190 by November 1,1979 as requested in the NRC letter to NPPD dated September 17, 1979.
VernonRooney,Pr$jectManager Operating Reactors Branch #3 Division of Operating Reactors
Enclosure:
List of resting attendees 1210 902
ENCLOSURE NRC/NPPD MEETING OCTOBER ll, 1979 APPENDIX I NPPD J. Weaver P. Borer J. Pilant L. Cooper J. Sayer Nuclear Safety Associates H. Morton NRC W. Pasciak J. Wing W. Burke L. Brown R. Bangart F. Congel V. Rooney t
1210 903
.