Forwards Response to IE Bulletin 79-15 Re Deep Draft Pump Deficiencies.Describes Pumps Used in safety-related Sys. Pumps Are Presently Being Installed.Repairs Performed. Supplier Corrected Other Problems
ML19254D019
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/07/1979
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 7910190296
Download: ML19254D019 (2)


Text

4 TH E CLEVi-! AND ELECTRIC ILLUMIi4 ATING COMPANY ILLUMINATING BLDG. e PUBUC SQUARE e CLIVELAND, OHIO 44101 e TELEPHONE (216) 823 1350 e MAIL ADDRESS: P.O. 30x 6000 Datwyn R. Davidson V:Of DRESCENT SiSTE W E NGINE ERING AND CONSTRUCTION September 7, 1979 United States Nuclear Regulatory Co::=ission Office of Inspection and Enforcement Washington, D.C. 20555 Attn: Director, Division of Reactor Construction Inspection Re: Perry Nuclear Power Plant (PNPP)

(Docket Ncs. 50-W O, 50-W l)

IE Bulletin No. 79-15

Dear Sir:

The following has been prepared as a response to IE Bulletin 79-15 pertaining to Deep Draft Pu=p Deficiencies.

The number of deep draft pumps used in safety-related application on Perry along with their descriptions is attached. The name of the manufacturer, the model, capacity, overall dimensions and plant application are included in the description of these pumps.

We are currently in the process of installing the subject pu=ps and have not yet acquired test or operating data at the plant site.

Some repair work on the Byron-Jackson pu=ps was performed on site. This work involved the replacement of a bent shaft due to shipping damage, and return of the Residual Heat Removal seal piping for a factory hydrotest.

In addition, upon witnessing scxne Byron-Jackson factory pump tests, several problems were observed, including short coastdowns, galled throttle bushing, and scored wear rings. 'Ihese problems were corrected by the supplier before the m s were shipped to the Perry site.

If you require further infor=ation, please let me know.

Very truly yours,

></

D. R. Davidson Vice President System Engineering and Construction DRD/c=w cc:

Mr. James G. Keppler, Director i 19 0 0"!I Region III, Office of Irspection and Enforcement U. S. Nuclear Regulatory Ccx: mission 799 Roos.evelt Road 4~1970 Glen Ellyn, Illinois 60137 Ni 7 910190 cR7 d q__

=._

i.

A

_ TYPE RHR FUMP LPCS PUMP HFCS FUMP DfERGENCY SERVICE WATER PLE!PS Tag No.

E12C002 E21 COOL E22 COOL 1&2 Ph5C001 A,B 1&2 Ph5C002 Total Perry I 3

1 1

2 1

Total Perry II 3

1 1

2 1

Manufacturer GE, bon-Jackson GE/'vron-Jackson GE/ Byron-Jackson Goulds Goulds Model 30DX-20CKXH 30DX-20Cn-H4 30DX-19Cn-L12 VIT 20x30BLC VIT 8x12JMC Flow-gpm 7260 6250 1680 11,500 960 Head-ft 293 760 2875 160 160 No. of Stages 3

5 13 2

5 Barrel length-in.

251 275 233 N.A.

N.A.

Barrel dia. - in.

37 37 37 N.A.

N.A.

Sueticn Nozzle dia.-in.

24 24 24 33 11-3/8 Discharge nozzle dia.-in.

18 16 16 20 8f'[

Easeplat.e to ist stage inlet-in.

242 266 275 492 426 M

N-e C3 C3 x0 N

Page 2 of 2

,