Notice of Violation from Insp on 790808-10
ML19254C601
Person / Time
Site: Perry  
Issue date: 08/27/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19254C600 List:
References
50-440-79-06, 50-440-79-6, 50-441-79-06, 50-441-79-6, NUDOCS 7910170028
Download: ML19254C601 (1)


Text

.

Appendix A AUG 2 8 MN NOTICE OF VIOLATION Cleveland Electric Illuminating Docket No. 50-440 Company Docket No. 50-441

~

Based on the results of the NRC inspection on August 8-10, 1979, it appears that certain of your activities were not conducted in full compliance with NRC requirements as noted below. This is an infraction.

10 CFR Part 50, Appendix B, C.riteria IX, states in part that, " Measures shall be established to assure that special processes including welding

. and nondestructive testing.

. are controlled and accomplished

. with... applicable specifications

. and other special '

requirements The Perry Nuclear Power Plant, Units 1 and 2, PSAR Section 17.1.9.2, stated in part that "CEI requires contractors to establish and document measures that will assure that special processes will be accomolished

. in accordance with the applicable codes.

Contrary to the above, Liquid Penetrant Examination (PT) Procedure 465-NC-N003, Rev. 3. August 15, 1977, specifies examinations can be performed down to 40 F.

However, a qualification procedure has not been established qualifying the process down to a temperature of 40 F as required by ASME Section V.

Liquid Penetrant Inspection Procedure 948-N-004, Rev. C, May 25, 1979, (AWS D1.1-75) is also being used specifying a temperature down to 40 F, without being qualified as required by ASTM E165-75.