Requests Extension of Time for Submitting Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys, Until Bechtel Power Corp Can Provide Final Design Documentation
ML19254B441
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/05/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7909270814
Download: ML19254B441 (1)


Text

y/C 8

Wisconsin Electnc poweecouesur 231 WEST MICHIGAN, MILWAUKEE, WISCONSIN 53201 September 5, 1979 Mr. J. G. Keppler, Director Office of Inspection and Enforcement Region III U.

S.

NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

IE BULLETIN 79-14 DOCKETS 50-266 and 50-301 POINT BEACH NUCLEAR PLANT, UNITS 1 and 2 IE Bulletin 79-14 entitled, " Seismic Analysis for As-Built Safety-Related Piping Systems" dated July 2, 1979 requested that within 60 days of the date of the Bulletin, we submit a description of the results of our inspection of normally accessible safety-related piping systems to verify that the seismic analysis applies to the actual configuration of the piping systems.

We have retained Bechtel Power Corporation, the original architect-engineer for the Point Beach Nuclear Plant, to assist us in responding to this Bulletin.

Becntel has provid.ed most of the information contained in our first response to Bulletin IE 79-14, which we submitted to you under date of August 1.

The final design documentation listing has not yet been completed.

We expect to have this response by September 7.

We advised Mr. Warnick of your office of this schedule by telephone on August 31.

We trust that this short extension of time for this response will not adversely affect your review of this matter.

Very truly yours, e

A Executive Vice Preside t 3EP 6 1979