ML19254B191

From kanterella
Jump to navigation Jump to search
Notifies That Recommended Groundwater Monitoring Sys by Burns & Roe Is in Design Stage.Work Order Encl
ML19254B191
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/31/1979
From: Rusche B
GENERAL PUBLIC UTILITIES CORP.
To: Jay Collins
NRC - TMI-2 OPERATIONS/SUPPORT TASK FORCE
References
WMATF-0029, WMATF-29, NUDOCS 7909240558
Download: ML19254B191 (2)


Text

/

hk 3[ ?,g #

ROUTING mfd TRANSMITTAL SLIP August 1, 1979 cate hd r' )

'1 TC: (rtane, caer symbol, r>am number, in:tia:s Dr.te 6:tilding. Assa:y/ Post) 1.

L. G. Hulman, Chief,10fB, DSE 2.

cc:

R. Vollmer W. Kreger 3.

i,26R '

i

~

TMI Rdg. File 4.

PSS TMI Rde. File SEP TMI Rdg. File f

15.

Action l FIIe Note and Return Approval l For Clearance Per Conversation l

As Requested For CorreeJon Prepare Reply Circulate For Your Information See Me Comment Investigate Signature Coordination 1 Justify RD.WtKS i

GROUND'JATER MONITORING PROGRAM L

RE:

l t.

i Attached is a memo from Ben Rusche to me indi-cating that they have directed Burns and Rowe I

to prepare a conceptual engineering package l

covering the items listed in your memorandum to R. Vollmer, subj ect as above.

We will keep you advised as to the results of this effort.

I i*

Enclosure:

Memo to JTCollins fm. BCRusche dtd. July 31, 1979

~

l DO NOT use this form as a RECORD of approvals. concurrences, disposals.

clearances, and similar actions g

FROM: Name, rg. symbol. Agency / Post)

Room No.-Bldg.

I Jo Collins, Deputy Director TMI Trailer #7 Support 1

Phone No.

x28976

[

So41-20d OPTIONAL FORM 41 (Rav. 7-76)

Present>ed by GsA NC.S.GN:197s-o-261-447 3354 FPMR (41 CFR) 101-11.206 l

Y

~

..u..

. u:,, -... :: s,....

e 992 262 300ROR'GINAL 7909240E7g

inter-Office Memorandum Dr'r-July 31, 1979 r

~

p 7] j,

i

%TF-0 029 J-o rl y '~',',* p.c T

\\:..^.l

.,ss S_b;ec: TMI-2 Groundwater Monitoring Program

~~

70 Q.3 giCo_1_lfrrs D iRCJ Locaton Three Mile Island ittachment:

Task Assignment to Burns and Roe, Inc.

Your letter of July 6, 1979, requested that we consider-installation of a groundwater monitoring system.

In that regard, we have directed Burns and Roe to prepare a conceptual engineering package, as described in the attached memorandum, and we will use that package as the basis for a decision as to whether we should proceed with installation of such a system.

We will keep you advised of our progress in this area.

I expect that we will be prepared to discuss final dis-position of this matter in about two weeks.

B.

C.

Rusche BCR/

/al ATT cc:

H.

R.

Lane, B&R J.

C.

DeVine, Jr.

992 263 GPU Serwce Corporation is a subsid;ary of Genera: Puthc Utd,t.es Corporat:on

~.

Date July 31, 1979 Task No.

~

File No. _ h'MATF-0027 TO:

Burns and Roe, Inc.

SUBJECT:

A/E Work Assignment References / Attachments:

Attached NRC Letter You are requested to perform the following work:

Via the referenced letter, NRC has asked us to consider installation of a groundwater monitoring program, to provide early detection of any leakage of high activity water from plant structures.

In this regard, please take action as fol2cws:

1.

Review the referenced letter a.

provide B&R's technical opinion as to the feasibility and effectiveness of the approach suggested by NRC.

2.

Prepare a conceptual engineering package for this work which defines I, umber, location, configuration and size (diameter and depth) of wells required, au.xiliary requirements (electrical power and others),

and discharge piping schematic.

3.

Prepare an approxir te cost estimate and schedule for the above work, taking into account availability of equipment and significant site impacts (if any) of the installation work.

4.

Assign a Ta'sk Number to this work.

Your response to this assignment is requested as soon as possible.

" '.e a s e advise us as to your earliest possible completion date.

I c-tb2-lL_.

cc:

File GPUSC A/E Acknowledgement Scheduled completion date Approximate A/E manhour.~other costs

._ _ _ _ _ _ --- _ _ _ _ _ -- _ _ _ __ _ _ _ _ _-- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Af E _ P yg j ecy_ Re p p e s e n t a t iv e_ _ _ _ _

Final Disposition g}

}hk Assignment completed via Work completed A/E Project Representative j

GPUSC Acceptance