Notifies That Changes to Anaconda QA Manual for Generating Station (Topical Rept AWC-75) Submitted in Are Acceptable.Discusses Four Unsatisfactory Changes & Means for Resolution
ML19254B064
Person / Time
Issue date: 08/27/1979
From: Haass W
Office of Nuclear Reactor Regulation
To: Rosen A
ANACONDA CO. (DIV. OF ATLANTIC RICHFIELD CO.)
References
NUDOCS 7909240023
Download: ML19254B064 (2)


Text

._ _._.

L PO R.

^

~

~

Mr. A. E. Rosen, Manager

. DIM

{

P{$h Pc..er Cable Quality Assurance Ta inaconda Company dire and Cable Division Ds: e,th Street l

.. rica, Indiana 46952

+

Eear Mr. Rosen :

i.

Tnis is in response to your letter which enclosed 45 proposed

  • changes dated lagustil.,

i.

1979 to the Anacor.da Quality Assurance Manual for Generating Station Cables Report AWC-75).

~

Our review of your proposed chah_gss kould nomally be coriducted using the acceptance t

criteria in Revision 1 of our Standard Review Plan (NUEG-75/087, Section 17.1).

However, noting your " intent' to start rewritir.g the entire manual following the exact fomat of the Standard Ibview Plan' ibvision 1,7 we have simply verified for i

the present that the proposed changes do not degyade. the program that was previously app roved. He do this with the proviso that the rewrite that addresses Revision 1 of the SFP will be submitted before 1981.

In this regard, you should note that, for new applications for construction pennits and operating licenses and those currently under review, we will detemine the acceptability of quality assurance

, 8 a

programs for utility applicants and thefr. contractors using Revision 1 of the SPP/,_-

Our review indicates that the 45 proposed changes are generally acceptable with the i

following exceptions 1.

(Change Nizaber 25) - The release of a purchase oNer to a supplier prior to

}

its quality assurance review is unacceptable. Quality assurance review of the purchase order should pre' cede order placeaent..

j I

2.

(Change Nisaber 32) - The deletion of the words, "that the materisl yhich is held pending completion of these tests is released when tests are.cc.moleted satisfactorily," is unacceptable. Material should not be released ur.til j

tests are satisfactorily completed.

3.

(Change Ntzaber 33) - The proposed language would be acceptable if, in two i

places, "a direct effect" is changed to "an effect."

4.

(Change dumber 36) - ihe proposed language would b~e acceptable if a cor:nitment is provided that access to the calibration standards is centrolled by quality assurance.

9 0924 0 c73 a ia

  • mans
  • c a?re I

Js 2C0 C"J! 314 (9-76) h*3C.t C243 D u.s. ** v e === e at ***a'**. e,,,e s :. e s s e e. v e e e

c.

llr. A. E. N en -

Witn the satisfactory resolution of these 4 i:r :. (Ond perhaps this can be accor.-

?lished by telephone and reflected in your recc0nse to this letter), we find that Macanda has described an acceptable quality assurcnce program for the design, procuren2nc, and fabrication activities thr.*. ara within its scope of work for nu: lear power plar.ts.

Please identify tfie revised report as AIC-75-A, Revision 2 dated August 1979, include a copy e.f this letter, ocr letter of September 20, 1976 and your transmittal letter in each report, anr1 transmit 44 copies to the Nuclear Regulatory Comission. Your transmittal letter.;hould include a ceraitment to provide a rewrite that addresses

'the acceptance criteria in Nvision 1 of Scction 17.1 of the SFP. Please contact JaQ, Suraul cf ny staff relative to the itcas enumerated above on (301) 492-7741 befpre trans;.litting Fbvision 2 to the Cecrtission.

i j

Sincerely, Orf#.at signed by Watter P. Haass 1

Walter P. Haass, Chief Quality /ssurance Branch Division of Project Management i

l Distribution Cencrai. file

~

QAB Projects t

l QAB Chron. File nnOQ~(h

{

NRR Reading Eile gg UNu' NRC POR

~

]

M0R NSIC DSkovholt JSpraul JGilray WHaass SBryan, IE FLiederbach, QAB

/\\

s

.nic.> k.[F!.li.QAB..

,, D,Pti;Q._

D{,I)AB

,, p [

_d SP.ra ul:3 t...F,L.i.ftdar,b.a.jh.U.J J.iray..

.,ERHaass.,

ev a.. >

,. 8/NH.9.,

.,8/Lh.79 N.- M 9 E.(N 2.9..

e.n

  • Nac rom:. ns (S.m acx o2.o h.....

m u...,...

....u :............

.c

~

.a

  • .