ML19253C864

From kanterella
Jump to navigation Jump to search
Summary of 791114 Meeting W/Us Corps of Engineers & Util Re Observation of Soil Settlement at Plant Sites
ML19253C864
Person / Time
Site: Midland
Issue date: 12/03/1979
From: Hood D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7912120257
Download: ML19253C864 (4)


Text

e e,

e Recu s

UNITED STATES

+

z

-ij NUCLE AR REGULATORY COMMISSION

[S c

~'

g wassinoron. o. c. 2osss

=

s

s,

f it i t-L' Docket Nos.-

50-329/330 APPLICANT:

Consumers Power Company FACILITY:

Midland Plant, Units 1 & 2

SUBJECT:

SUMMARY

OF NOVEMBER 14, 1979 MEETING WITH U. S. CORPS OF ENGINEERS TO OBSERVE S0ll SETTLEMENT AT MIDLAND 1 & 2 SITE On November 14, 1979, the NRC staff accompanied representatives of the U. S.

Corps of Engineers on a tour of the site for Midland Plant, Units 1 & 2.

The Corps is assisting the NRC in the geotechnical review of the Midland site, including abnormal settlement resulting from the type of fill and achievement 01 insufficient compactive effort. Trip attendees and contacts are listed in the enclosure.

The visit provided the initial site tour by the Corps.

The conditions and remedial actions observed are reflected in recent documentation by the applicant submitted as interim reports to the 50.55(e) notification and as revisions to the responses to the staff's 50.54(f) requests on plant backfill settlement.

Brief presentations prior to this tour were given by the applicant and Bechtel concerning the history and present status of the settlement matter.

At //n.D Darl Hood, Project Manager Light Water Reactors Branch No. 4

,, Division of Project Management x

')

Enclosure:

As stated cc See next page.

1535 019 4

/

79121 2 (1

e Consumers Pover Company ccs:

Michael

1. Miller,l.sq.

Mr. S. H. Howell Isham, Lincoln 6 Beale Vice President Suite 4200 Consumers Power Company 2

One First National Pl aza 212 West Michigan Avenue Chicago, Illinois 60603 Jackson, Michigan 49201 Judd L. liacun, L',q.

Mr. William Lawhead Consucers Power to:apany U. S. Corps of Engineers 212 West Michigan Avenue NCEED-T Jackson, Michigan 49201 477 Michigan Avenue 7th Floor Mr. Paul A. Perry Detroit, Michigan 48226 Secretary Consumers Pover Colapariy Mr. Larry Auge 212 W. Michigan Avenue Energy Technology Engineering Center Jackson, Michigan 49201 Canoga Park, California 91304 Myron M. Cherry, Esq.

One IBM Plaza Chicago, Illinois 60611 Mary Sinclair 5711 Summerset brive Midiand, Michigan 48640 f rank J. Kelley, Lsq.

Attorney General State of Michigan Erivironmental Protection Div ision 720 Law Building Lansing, Michigan 48913 Fr. Wendell Farshall Route 10 Midland, Michigan 48640 Grant J. Merritt, Lsq.

Thompson, Niel sen, K1 averkamp & James 4444 IDS Center 80 South Eighth Street Minneapolis, Minnesota 55402 Mr. Don van Farove, Chief Division of Radiological Health Department of Public ibalth 9 ^^ ^3 g g Q CDg Q

<h P. O. Box 33035 g

g

' g "'

d' Lansing, Michigan 40'JU9 1535 C20

s. --

ENCLOSURE Trip _ Attendees:

November 14, 1979 U. S. Corps of Engineers (Detroit)

Ron Erickson Joe Kubinski NRC Ray Gonzales (Hydrology Branch)

Gene Gallagher (IE, Region III)

R. J. Cook (IE Resident Site Inspector)

D. Hood (Division of Project Management)

Contacts Consumers Power Company T. C. Cooke (Project Superintendent)

R. G. Wollney (QA Group Superintendent)

Bechtel A. Boos (Project Field Engineer)

C. McConnell (Engineer)

J. O. Wanzeck (Geotechnical Engineer) t 1535 021