ML19253C574

From kanterella
Jump to navigation Jump to search
Notification of 791211 Meeting W/Util & Exxon Re Exxon Setpoint Methodology to Be Used for Cycle 6 Relaod & Stretch Power
ML19253C574
Person / Time
Site: Fort Calhoun 
Issue date: 11/28/1979
From: Erickson P
Office of Nuclear Reactor Regulation
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7912060360
Download: ML19253C574 (2)


Text

Enclosure 17/b

  1. p arco f,

fg UNITED STATES y

g NUCLEAR REGULATORY COMMISSION g

E WASHINGTON D.C.20555 8

November 28, 1979

%,*****p Docket No. 50-285 MEMORANDUM FOR: Robert W. Reid, Chief, Operating Reactors Branch #4, Division of Operating Reactors FROM:

Peter B. Erickson, Project Managar, Operating Reactors Branch #4, Division of Operating Reactors

SUBJECT:

FORTHCOMING MEETING WITH OMAHA PUBLIC POWER DISTRICT (OPPD)

TIME & DATE:

8:30 am, Tuesday Decenber 11, 1979 LOCATION:

OPPD Engineering Office 4th Floor Conference Room, 4th & Ma' cy Sts.

Omaha, Nebraska PURPOSE:

To discuss EXXON setpoint methodology to be used for Fort Calhoun, Cycle 6 Reload and Stretch Power PARTICIPANTS:

NRC P. Erickson, R. Lobel OPPD K. Morris, B. Hickel EXXON J. Owsley, et al 3

eter B. Erickson, Project Manager Operating Reactors Branch #4 Division of Operating Reactors cc:

See other side of this page 1506 006 19 / ao6 o.34,O P

~

MEETING tl0TICE DISTRIBUTION ORB #4 Docket File W. Gammill NRC PDR L. Shao L PDR J. Miller ORB #4 Rdg NRR Rdg H. Denton E. G. Case D. Eisenhut R. Vollmer W. Russell B. Grimes T. J. Carter A. Schwencer D. Ziemann T. Ippolito R. Relo V. Noonan P. Check G. Lainas G. Knighton Project ilanager OELD OI&E(3)

OSD S. Showe, I&E (PWR)

R. Ingram Receptionist, Bethesda R. Fraley, ACRS (16)

Program Support Branch TERA

-e, n o,.-sen n Meeting Notice File NRC Participants R. Lobel W

,1 4..

7912060 p..