Responds to NRC 791023 Ltr Re Violations Noted in IE Insp Rept 50-313/79-21.Corrective Actions:Plant Q-list & Distribution List Revised & Circulated
ML19253C518
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/15/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19253C517 List:
References
NUDOCS 7912050687
Download: ML19253C518 (2)


Text

t.<' .

ARKANSAS POWER & LIGHT COMPANY POST OFFICE 80X 551 LITTLE ROCK. ARKANSAS 72003 (501)371-4000 November 15, 1979 1-119-11 Mr. G. L. Madsen, Chief Reactor Operations & Nuclear Support Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texar 76011

Subject:

Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Inspection Report No. 50-313/79-21 (File: 0232)

Gentlemen:

The following is submitted in response to your Notice of Violation contained in the subject report dated October 23, 1979.

Item:

Technical Specification 6.8.1 requires that, " Written procedures shall be established, implemented, and maintained covering . . . a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33."

As required in paragraph A of Appendix A to Regulatory Guide 1.33, Pro-cedure GCP 300 " Nuclear Licensing Document Control" has been established.

Section 4.4.7.2 of this procedure requires that each designated person having a copy of the Q-List shall ensure that his Q-List is kept up to date with all amendments.

Contrary to the above, three members of the AP&L staff were found to have outdated copics of the Unit 1 Q-List.

Response

The distribution list for the Arkansas Nuc1 car One-Unit 1 (ANO-1) Q-List has been revised and current copies of the Q-List have been sent to every-one on this revised distribution list.

1504 010

_e_oom eoor,4 ur,uree e s,-

79 g pp

Mr. G. L. Madsen November 15, 1979 4

To avoid further noncompliance, all future copics of the ANO-1 Q-List sent to ANO will be sent to the attention of the Gcaeral Manager. The copies will then be distributed by ANO Document Control. Full compliance will be achieved by December 10, 1979, at which time all transmittal sheets should be returned.

Very truly yours, N ~

David C. Trimlyl

/ '/ [";

Manager, Licensing DCT: MAS:nak cc: Mr. W. D. Johnson U. S. Nuclear Regulatory Commission Post C'fice Box 2090 Russellville, Arkansas 72801 1504 011 r

~~

-- - - -- . -