Notice of Violation from Insp on 790917-20
ML19253C422
Person / Time
Site: Wolf Creek 
Issue date: 10/24/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19253C421 List:
References
50-482-79-17, NUDOCS 7912050468
Download: ML19253C422 (1)


Text

.

STN 50-482/79-17 Appendix A NOTICE OF VIOLATION Based on the results of the NRC inspection conducted on September 17-20, 1979, it appears that certain of your activities were not conducted in full com-pliance with the conditions of your NRC Construction Permit No. CPPR-147 as indicated below:

10 CFR 50, Appendix B, Criterion V states:

" Activities affectIu3 quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.

Instruc-tions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activi-ties have been satisfactorily accomplished."

Sargent and Lundy Specification A-3854, Paragraph 302.9e, statec:

" Contractor shall assign to the blasting operations and maintain on a full-time basis during the time blasting is in progress, a spec-ialist of mature experience, specialized in the use of explosives for foundation excavation. His qualifications shall be subject to the approval of Purchaser."

Contrary to the above:

The qualification of the blasting specialist assigned by Clarkson (Contractor) to conduct blasting operations, on September 15, 1979, and days fol?: wing, had not been approved by the Daniel Internaticnal Area Civil En/ineer (Purchaser).

This is an intraction.