ML19253B977

From kanterella
Jump to navigation Jump to search
Amend 37 to DPR-50,deleting Requirement for Annual Rept, Except for Annual Submission of Occupational Exposure & Aircraft Traffic Data, & Adding Requirement for Submittal of Monthly Operating Rept
ML19253B977
Person / Time
Site: Crane 
Issue date: 02/10/1978
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19253B976 List:
References
NUDOCS 7911020516
Download: ML19253B977 (6)


Text

.

%,t UNITED STATES j

NUCt. EAR REGULATORY COMMISSION f.

'M j

WASHINGTON, D. C. 20566

,1 j[

METROPOLITAN EDISON COMPANY f y Y CENTRAL POWER AND LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY DOCKET NO. 50-289 THREE MILE ISLAND NUCLEAR STATION, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amndment No, 37 License No. DPR-50 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendrent by etropolitan Edison Company, Jersey Central Power A Light Ccmpany, and Pennsylvania Electric Company (the licensees) dated Ja iuary 13, 1978, complies with the standards and recuirerrnts of the Atomic Eneray Act of 195a, as amended (*ne Act), and the Comission's rules and regulations set ' orth in 10 CFR Chapter I; B.

The facility will operate in confomity with the application, the provisioris of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the coninon defense ard security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

1505 006

.. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Facility Operating License No. DPR-50 is hereby amended to read as follows:

~

(2) Technical Specificat ans The Tecanical Specifications contained in Appendices A and 5 as revised through Amendment Nc. 37. are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISS10ft

-Q 7

yf a o b&

Cl.:, '

Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors

Attachment:

Changes to the Technical Specifications Date of Issuance: Februa ry 10, 1978 t505 007

ATTACHME'!T TO LICENSE A"ENDMENT N0. 37 FACILITY OPEPATING LICENSE NO. CPR-50 DOCKET NO. 50-289 Revise Appendi-x A as follows':

Remove Paces Insert Paces 6-12 8. 6-14 6-12 A 6-13 6-18 6-18 Page 6-26 should be renumbered 6-22.

The changed areas on the re ised pages are shown by marcinal lines.

Note: Amendment No. 35 reauested the removal of paces 6 6 25 and the insertior. of panes 6-20 and 6-21.

Prior to insertinc revised pace 6-20, the existing pane 6-20 should have been removed.

1505 008

6.9 REPORTING RE0IIIBEM

.S In addition to the applicable reperting requirements of Title 10 Code of Federal Regulations, the folleving identified reports eb=11 be sub=1tted to the Director of the appropriate Regional Office of Inspection and Enforce =ent unless otherwise noted.

6.9 1 Routine Reports A.

Sta -tur Renert. A su.=ary repcrt of plant startup and power escalation testing shall be submitted following (1) receipt of an operating license, (2) mnendment to the license involving a planned increase in pcVer level, (3) installation of fuel that has a different design er has been =anufactured by a different fuel supplier, and (h)

=odifications that =ay have significantly altered the nuc' ear, the. al, or hydraulic perfor ance of the plant.

Th<. report shall address each of the tests identified in the FSAR and shall in general include a description of the measured values of the operating conditions er characteristics obtained during the test pregra= and a ec=parison of these values with design predictions and specifications.

Any corrective actions that were required to obtain satisfactory operation shall also be described.

Any additicnal specific details requ' ired in license conditienc based en cther ce==it=ents shall be included in this report.

Startup reports shall be sub=itted within (1) 90 dayc following ec=pletion of the startup test progra=, (2; 90 days following resu=ption er ec==ence=ent of ec==ercial power operation, er (3) 9 =cnths following initial criticalit;.,

whichever is earliest.

If the Startup Repcrt does not cover all three events (i.e., initial criticality, cc=pletion of startup test progra=, and resu=ption or cctmencement cf cc==ercial pcver operatien), supple =entary reports shall be submitted at least every three =enths until all three events have been ec=pleted.

B.

Annual Reperts. [/ Annual reports covering the activities I

of the unit as described belov during the previcus calendar year shall be submitted prior te March 1 cf each ye ar.

The initial repcrt shall be submitted prior tc March 1 cf the year folleving initial criticality.

Reports required on an annual basis shall include:

~

1.

A tabulation en an annual basis of the number of l

station, utility and other persennel (including contractors) receiving exposures greater than 10?

tre=/yr and their associated =2n ren exposure ac-cording to work and job functions, i/ (e.g., reacter I

cperations and surveillance, inservice inspection, routin( =aintenance, special =aintenance (describe

=aintenance), vaste procer-ing, and refueling).

The dose assignment to varicus duty functicns may be esti=ates based en pceket desimeter, TLD, or fiLn bad 6e measurements.

Small expcsures totalling less than 20% of the indiridual tetal dose need not be accounted for.

In the aggregate, at least c0% of the total whole body dose received frc= external sourcec shall be assigned to srecific =ajor verk functions.

Amendnent No. Jf',

37 1gng nno 6-12 1JUJ UU/

2.

The following infor:ation on aircraft =ove=ents at the Harrisburg International Airport:

The total nu=ber of aircraft =ovements (takeoffs a.

and landings) at the Harrisburg Internaticnal Airport for the previous twelve-=onth period.

b.

The toia'1'nu=ber of =cve=ents of aircraft larger than 200,000 pounds, based on a current per-centage estimate pre rided by the airpcrt manager.

C.

Monthly 0;erating Reoort. Routine reports of cperating statistics and shutdo.n experience shall be sub=itted en a =onthly basis to the Office of Manacement Information and Program Control, U. S. Nuclear Regulatory Comr.ission,.

Washington, D.C. 20555, with a copy to the Regional Office, no later than the fifteenth (15th) day of each month following the calendar month cotered by the repor*-

I e

l 6.9 2 Reportable Occurrences _/

Reportable Occurrences, including corrective actions and =easures to prevent recurrence, shall te reported to the NRC.

Supplemental reports may be required to fully describe final resolution of an cecurrence.

In case of corrected or supplemental reports, reference shall be =ade to the original report date.

Note: Page 6-14 deleted.

Amendment No. )df, 37 6-13 1505 010

6.9 REPORTIN" REQU!3D'ENTS (cent'd) 6.9.3 Unique Reporting Require =ents A.

Special reports shall be sub=itted to the Director -of the Regulatory Operations Regicnal Office within the time period specified for each report.

These reports shall te sub=itted covering the activities identified below:

Tests Submittal Datec (1) Contain=ent Structural Integrity Test (a) Tenden Surveillance Progra=

Within 3 =enths after perfor=ance of surveil:_m ee progra=.

(b) Ring Girdec Inspection Withi= 3 =cnths Prbgra=

after perfer ance each inspecticn.

(2) Contain=ent Integrated leak Within 6 =cnths Rate Test after ec=pleticn of test.

(3)

Inservice Inspection Progrs=

within 6 months af ter five yearc of operation.

POOTNCTES 1.

These reporting require =ents apply cely to Appendix A technical speci-2 A single submittal :.y be made for a =ultiple unit station. The sub-nJ +.te.1 should ec=bine these secticns that are cc==cn *.o all units st the statics 3.

This taculation suppler.ents the require =ents of 520.h07 of 10 CEF Fart 20.

6 1505011 AmendmentNo.Ja(,37 6-18

.