,idRM 19s U.S. NUCLE AR REGULATORY Cr DN OOCKET NUMBER So-2s9
- m
- NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL
$n u t r o TO:'
FROM:
DATE OF OOCUMENT Metropolitan Zdison Company 3/22/77 Ur. J. P. C' Reilly Reading, Pa.
DATE RECEivEO R. C Arnold 3fggf77
[
BLETTER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVEO dORIGIN AL WNCLASSIFIEO CCcPv
/
S h
i DESCRIPTION ENCLOSU RE Ltr. trar.; the following:
Licensee Event Report (R0 50 289/77-02/4T) on 3/4/77 concerning river water discha'ge r
exceeding the inlet river water temperatyre by 14 degrees thus exceeding the 12 degree F limit....
t (3-P)
(l-P)
~
PLANT NAME:
Three Mile Island No. 1 RJL SAFETY FOR ACTION /INFORMATION ymrinn ASSIGNED AD:
A997eNun A n.
/ BRANCH CMTEF:
Me t d S) unanru r*nTyv.
[ PROJECT MANAGER:
2w 4.f1. s % l PROJECT MANAGER:
/LIC. ASST. :
TMpM LIC. ASST.
~
INTERNAL DISTRIBUTION
/ REG FILE)
SYSTEMS SAFETY PLANT SYSTEMS SITE SAFETY &
~
/ NRC PDR REINEMAN TEDESCO ENVIRO ANALYSIS
/ I & E ( 2.)
SCHROEDER BENAROYA DENTON & wtT ru
/ OELD YlTNA9
,j GOSSICK & STAFF ENGINEERING IPPOLITO ENVIRO TECH.
MIPC MACARRY KTRKWOOD ERNST I
CASE BO3NA;.
/ BALLARD
/
HANAUER SIHWEIL OPERATING REACTORS YOUNGBLOOD I
HARLESS PAWLICKI STELLO I
SITE TECH.
PROJECT MANAGEMENT l REACTOR SAFETY OPERATING ECH.
CAMMILL I
BOYD ROSS EISENHUP STEPP i
P. COLLINS NOVAK SHA0 HULMAN i
HOUSTON ROSZTOCZY BAER I
PETERSON CHECK BITC.ER SITE ANALYSIS i
MELTZ
/ CRIMES VOLLMER HELTEMES AT & I BUNCH l
~~
SKOVHOLT SALTZMAN I
/ J. COLLINS RUTBERC l
KRECER 1
EXTERN AL DISTRIBUTION CONTROL NUMBER i
[LPDR; Nawe t L a [( / NAT. LAB N Al L BROOKHAVEN MAT. YAM.
/ TIC:
,j
/ NSIC:
CONSULTANTS:
/IACRS CYS Me8M mfC/$ EFT 8 S C. A7 A 1504
.5 42 7922 oi 073s s -
~Rc FO ~,.. m.,..
/
s.
e.,
fYbl V
- /:,;,,C.,,'
praven me reoanns METROPOL! TAN EDISON COMPANY POST OFFICE BOX 542 RE ADING, PENNSYLVANI A 19602 TELEPHONE 215 - 929-3601 March 22, 1977 GQL 03h6 s.. " %.
Mr.
J.
F. O'Reilly, Director Office of Inspect,lon & F.nforcement, Region I U. S. Nuclear Regulatory Commission 631 Fark I.venuc King of Prussia, PA' 19hC6
Dear Sir:
Docket No. 50-289 Operating License No. DFR-50 In accordance with the Technical Specifications of our Three Mile Island Nuclear Station Unit I (TMI-1), we are reporting the following reportable occurrence. However, as stated in the telephone conversation with Mr. Davis on March 13, 1977, this report is 2 days late.
1)
Report Number: 77-02/hT
- 22) Required Report Date: 03-18-77 2b) Date of Occurrence: 03-Oh-77 3)
Facility: Three Mile Island Nuclear Station - Unit I h)
Identification of Occurrence:
Title:
River 'Jater Discharge exceeded the inlet river water temperature by 1h F thus exceeding the 12 F limit.
Type: A reportable occurrence as defined by Environmental Specification 5.6.2.3 in that the river water discharge temperature exceeded the inlet river water temperature by greater than the limit of 12 F, thus, exceeding a limiting condition for operation established in Environmental Technical Specification 2.1.b. (1).
1504 343 7?os?oo36
. Mr. J. P. O'Reilly March 22, 1977 GQL 03h6 5)
Conditions Prior to occurrence:
Power: Core:
251h MWt Elec:
832 MWe RC pressure:
2169 psis RC ficw:
139 x 10 lbs/hr C
EC temp:
579 F PEZR level:
209 inches PRZR temp:
650 F 6.
Description of Occurrence:
On March h, 1977, at approximately 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, the river water discharge temperature exceeded the inlet river water temperature by more than 12CF with a maximum AT reaching 1kOF.
The AT was gradually increasing during the day prior to the incident is a result of:
Increasing and unseasonable high ambient temperatures (peaking at a.
Sh.h F) b.
Nearly 100% relative humidity during the day, rendering the Mechanical Draft Cooling Tower (MDCT) inc?fective to cool the river water discharge.
At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> the fans were secured to reduce the heating effect of the towers. At approximately 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the AT chart recorder in the Control Room appeared to have leveled off at 11.6 F, but had, in fact, reached the techanical stop. The operator continued to atte=pt to reduce the AT by increasing total River Water flow but was unsuccessful until the standby Decay Heat River Water pump was started. After 15 minutes of operation the DERW pump was stopped in order to decrease the rate of AT change. The AT was belcw 12cy, 7.
Apparent Cause of Occurrence:
This event has been determined to result from a ec=bination of the following:
a.
The existing procedures lack the specific corrective action to take when high ambient temperature and relative humidity ec=bined with low river water temperature cause an increasing AT.
b.
A personnel error was e contributing factor in that, ence the AT chart reccrder was against the mechanical stcp, the back-up AT chart in the MDCT Pu=p House was not i==ediately inspected to determine the AT.
c.
The MDCT was ineffective due to the abnormal 1=bient conditions and the low river water temperature.
8.
Analysis of Cccurrence:
It has been determined that this occurrence did not adversely affect the environment in that the 2T excursicn to a maximum of lho? lasted only a short period of time.
1504 344
Mr. J. P. O'Reilly
_ March 22,1977 GQL 03h6 9
Corrective Acticn:
In ad !ition to the i= mediate action described above:
e.
All licensed operators will be briefed on this AT excursion, the requirements to use back-up instrumentation to assure compliance with Technical Specifications, and the sequence of corrective measures to be taken in the event of a similar AT excursion.
b.
Section 37.3.h.2 of the MDCT operating Procedure vill be revised to provide expended guidance to assure the AT Technical Specificaticns limits are not exceeded.
The Plant Operation Review Cc=mittee and Unit Superintendent have reviewed and approved the above corrective action and have taken steps to assure its completion.
10.
Failure Data:
NA Similar Events None Sincerely,
(\\ /