ML19253B948

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for July 1976
ML19253B948
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/31/1976
From: Lawyer L
METROPOLITAN EDISON CO.
To:
Shared Package
ML19253B934 List:
References
NUDOCS 7910310703
Download: ML19253B948 (3)


Text

m UNIT Three !!ile IcInn<1 //1 DJ.TE Auguct 2, 1976 COMPLETED BY L. L. Lavfer 215-929-3601 TEL. NO. Ext. 111 DAILY PLANT POWER OUTFlTP MONTH July 1976 DAY AVERAGE DAILY MWe-net DAY AVERAGE DAILY M'4e-net 1

Th1 21 781 2

630 22 783 3

__7_87 23 787 h

788 2h 780 5

78h 25 792 6

78h 26 79h 7

780 27 776 8

78h 28 783 9

78h 29 779 10 788 30 778 11 78h 31 782 12 778 13 788 1h 789 15 781 16 781 17 78' 1505

.540 18 79h 19 788 7910310 7 0 ]

^

on

UNIT NAME Thre, M!1_ u 1..~i ai DATE Auru::t 2, 1976 COMPLETED BY L. L. Lar/er 215-929-3601 TEL. NO. Ext. 111 0PE3ATING STATUS 1.

REPORTING PERIOD:

0001,760701 THROUGH 2 LOG.760731 GROSS HOURS IN REPORTING PERIOD:

Thk 2.

CURRENTLY AUTHORIZED POWER LEVEL !Gt 2535 MWe-NET 792 (MAXIMUM D_EPEIDAELE CAPACITY - MDC) 1 3

POWER LEVEL TO '4HICH RESTRICTED (IF ANY):

UCNE h.

REASONS FOR RESTRICTIONS (IF ANY): NA THIS CUMULATIVE MONTH YR-TO-DATE

"'O DATE 7LL 2& _ ~

128L6.1 5

HOURS REACTOR WAS CRITICAL.

0 0

0 6.

REACTOR RESERVE SHUTDOWN HGURS.

ThL 2757.7 12518.6 7

HOURS GE?ERATOR ON-LINE O

O O

8.

UNIT RESERVE SHUTDOWN HOURS 9

GROSS THERMAL POWER GE ERATED (%71) 1859879 67L8372 30579972 10.

GROSS ELECTRICAL PCWER GEIERATED (%71) 613LSk 2251572 1C281986 578793 2096038 9615373 11.

NET ELECTRICAL POWER GE?ERATED (%71) 1005 5 5. h f, 76.6%

12.

REAC'IOR AVAILABILITY FACTOR (1) 1C0%

5h. 0,4 7L.60 1505 741

SUf"*A!.t :

Ihe p l ari t ep rate 1 at ess+ ritially 100% full pimer fer the entire p.if T NMtE Three Mile Islard! #1 mnth, e x-ej t for a power re l setion to 27% FP on.iuly 2,1976 for eined naticn of I h-V-1.

0ATF Aurast 2. 1976 C0ffLFTE11 Pi L. L. Iavyer 215-929-3601 TEL. No. Ext. Ili e

REFCPT MONTH July 1976 P! ANT SHUTD0WNS TYli METliCD OF F -FOP':ED DUFATIr r; SHLTTING DOWii 30 FATE S-D:liEDULED (liOURS )

FEASON (1)

Tl!E bEACTOR (2)

Cot!!F.NTS N

w (1) REASON:

(2) Mrril0D:

A-EQUIP!!E*lT FAILURE (FXTLAIN)

A-fW3UAL B-MAINT. OR TEST P-!WlUAL SCRAM C-RE WELIllG C-AUTOMATIC SCR/01 D-REGUIAMRY RESTRICTION E-OFERATOR TRAINING AND LICENSE EXAMINATION F-AININISTPATIVE G-OPESATIONAL EFROR W

(EXPLAIN) c-)

H-0THER LM

'. r-M N

.