Monthly Operating Rept for May 1976
ML19253B890
Person / Time
Site: Crane 
Issue date: 06/08/1976
From: Lawyer L
METROPOLITAN EDISON CO.
To:
Shared Package
ML19253B889 List:
References
NUDOCS 7910310628
Download: ML19253B890 (3)


Text

..

UNIT Three aila T c 11. n d DATE June 8, 1076 COMPLETED BY L. L. Lawyer TEL. No. 215-929-3601 DAILY PLANT PCWER OUTPUT MONTH MAY DAY AVERAGE DAILY fGe-net DAY AVERAGE DAILY MWe-net 1

-9 21

-39

~12 2

22

~~ 1.

-11 h2 3

23 b

-10 2h h2

-11 5

25

-a2 6

-11 26

-25

-11 7

27 1k1 265 8

-13 28 9

-15 h92 29 10

-15 592 30 11

-15 31

-lk 12

-13 13

-lh 1h

-13 15

-lk 16 1505 26,

-22 17 18

-27

-27 19 7910810 2p

e SL!MAhY:

UNIT NAME Three Mile Island - Unit 1 DATE June 8, 1976 COMPLETED BY b* I'* b"*Y'I TEL. NO. 929-3601 Ext. 111 fiPORT MONTH PLANT SHUTD0WNS Typt MFTif0D OF F-F0hCED I,U*ATILtj SHIIITING DOWN Na.

LME S-SCHEDULED

(.iOUhs )

REASGN (1)

THE REACTOR (2)

COhMENTS 2

2/./0/(6 S

620.8 C

A Con:pletion of Befuelis.g 3

5/27/'(6 F

T G

C Durir.g power escalation nuclear instrun:entation indicated power was 46% while actual power, as calculated by a reactor heat lalance, was f 5%. Huclear Instrumentation power range crannel NI 6 was calitrated t.o 25% power while power range channel NI-5 was ec;ntrolling Integrate :

Control System's (ICS) functions. After N1-6 calit> ration was cc u pletel, ICS control was switched from 13I-5 to NI-6 prior to changing the ec.ntrol cod drive system cont rol to the manual ;csition. Since den.and was at 46% tefore the switch, the ICS systen "saw" that reactor power had fropped lower than denand (i.e. 25% vs. h6%) and started pullir.g control rods to increase power. Henctor Protection System (RIS) channels A&C tripped on overpower at 50% power (BPS trip setpoints had

~

been set to 50% power for reactor physics tests purpose:5).

O Ln N

(1) REASON:

(2) METHOD:

A-EQUIPMENT FAILUBE (EXPLAIN)

A-MANUAL g

)

B-MAINT. OR TEST B-ftANUAL SchAM C-REFULLING C-AlfrOMATIC SUGd4 D-BEGULA'IDHY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-AININISTRATIVE G-OPEPATIONAL EbHOH f vvn. r "O

.,, - - =

Three "f 4 Island JIT.uME

  • une 9, 1976 parg COMPLETED M L. L. Dr.yar TEL. NO.

~'c v -*

r.~

OPERATING STATUS 0001, 76c501 THRcucH 2aCO, 76C531 1.

REPORTING PERIOD:

I' k GROSS HCURS IN REPORTING PERICD:

2535 MWe-NET 792 (MAXIMLN DEPE!CA2LE 2.

CURRENTLY AUTHORIZED PCWER LEVEL MWt CAPACITY - MCC)

NCne 3 PCVER LEVEL 'ID WHICH RECTRICTED (IF ANY):

k.

REASONS FOR RESTRICTICNS (IF ANY):

NA TdIS CUMULAT!VE MONTH YR-TC-DATE

'"O DA*E 18k.6 1360.7 11332.?

I 5 HOURS REACTOR WAS CRITICAL 0

0 0

6.

REACTOR RESERVE SHUTDCWN HOURS.

116.2 1293.7 1105L.6 7 HOURS CENERA"CR CN-LINE O

C 0

I 8.

UNIT RESERVE SHUTDOWN HCURS

.913, 21 176 h36 3.087 J21 9 CROSS THERMAL PCWER GE:ERATED (MWH) 56,570 1 CLO,7;L 9,C71,203 10.

GROSS ELECTRICAL POWER GENERATED (MWH).

e i

37,325 953,572 3,k?2,907 11.

NFI ELECTRICAL PCWG C".! ERA *ED lWM).

2k.S 37.6 Th.3 12.

REACTCR AVAILA3ILITY FACTOR (1) 15.6 35.5 72.2 13 UNIT AVAILABILITY FACTCR (2) 6k 33 0 69.0 14.

UNIT CAPACITY FACTOR (3) 5.7 3.9 3.3 15 KRCED CL'TAGE RATE (k)

16. SHUTDCWNS SCHEDULED 'IO 3EGIN IN NEXT 6 MCN*! ' (STATE n FE, CA*I, AND CURATION OF EACH):

,,cne NA IF SHUTDCVN AT END CF REPCRT PERICD. ESTIMATED DATE CF STARTUP:

17

18. UNI 3 IN TEST STATUS (PRIOR TD CCMICRCIAL CPERATICN):

'iOT APPLICABLc

'l^d (1) REAC' OR AVAII.A. BILIN FAC"UR= " " * "~

'~u

NCO3 HCURS ;N REPCET!:10 FERIuc

....e

., cc

.:ve

.--ru p" q "

(2) UNIT AVAILABILITY FAC*CR= G?% HOURS' T "'^^ IN REPGRTIL FE?!CD

~

r' r -

' m~n aprgp".-en

( 3) UNIT CAPAC!'"Y FAC"tR N& M;c" u"q - aA.

'" aacoc scc?s :N FErcsT::w : p ; w r'. ~e - neu *

., r r" e

vc sr~ q' " w' m' " '

(k) FCRCED OUTA0E PATE EOURS GENERATCH G -u:2 + fcrJID CUTAJE HOUPC 1505 263