ML19253B850

From kanterella
Jump to navigation Jump to search
Forwards LER 78-025/01T-0
Date released: 09/24/2019 Download: ML19253B850


LER 78-025/01T-0:on 780818-19,neither of Two Inservice Nuclear River Water Pumps Were Selected to Start on Engineered Safeguards Signal.Caused by Personnel Error. Pumps Selected & Personnel to Be Briefed
ML19253B853
Person / Time
Site: Crane 
Issue date: 08/30/1978
From: Mitchell D
METROPOLITAN EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B853 (2)
Forwards LER 78-025/01T-0
ML19253B849
Person / Time
Site: Crane 
Issue date: 08/30/1978
From: Herbein J
METROPOLITAN EDISON CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B849 (2)