ML19253B724

From kanterella
Jump to navigation Jump to search
Insp Rept 50-289/74-12 on 740310-12,14,18-20 & 22-23. Noncompliance Noted:Electrical Ground Search Conducted W/Completed & Approved Work Authorization
ML19253B724
Person / Time
Site: Crane 
Issue date: 04/11/1974
From: Mccabe E, Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19253B722 List:
References
50-289-74-12, NUDOCS 7910180712
Download: ML19253B724 (1)


See also: IR 05000289/1974012

Text

.

.

.

'

EUCLOSL.T. 1

-

.

i

~ DESCRIPTION OF FIOL/.TI0'J

-

.

.

ctropolitan Edison Conpany

Dochet Jo. 50-239

License Jo. CPPR-40

The follcuing activity under your license appears to be in violation

of AEC requirements and is considered to be of Category III severity.

-

1.

Crite: ;n V, Appendix B, 10 CFR 50, states in part: -' Activities

affecting quality...shall be accomplished in accordance with

these (prescribed) instructions, procedures, or drawings."

Contrary to the above, an electrical ground search was undertaken

without a completed and approved work authorization as required by

Section 6.6 of the Initial Reactor Building Leak Rate Test

Procedure.

-

.

PCER BRIGINAL

^

,

-

.

.

.

.

1445 l19

i .7910180 3./2

.

,,