Monthly Operating Rept for Sept 1979
ML19253B606
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/01/1979
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19253B605 List:
References
NUDOCS 7910160471
Download: ML19253B606 (4)


Text

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS SEPTEMBER, 1979 In September, 1979, the Unit Cycle I-II refueling outage continued to perform inspection and repair of anchor bolts.

The following significant safety-related maintenance was performed in September:

1.

Conducted vibration tests on Charging Pumps lA and 1B.

2.

Performed an 18 month Preventive Maintenance Procedure on IB Diesel.

3.

Continued work on 2B Diesel.

1154 314 7 91016 0 eP 7 f

OPERATLNG DATA REPORT t

DOCKET NO. 50-348 DATE 10/1/79 COMPLETED BY W.

G.

Hairston, III TELEPHONE (205)899-5156 OPERATING STATUS

1. Unit Name:

.Toseph M. Farley - Unit 1 Notes 1/ Cumulative Data

2. Reporting Period:

September. 1979 since 12/1/77, date of

3. Licensed Thermal Power (MWt):

2652 commereial operation.

860

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

A60*

829*

7. Maximum Dependable Capacity (Net MWe).
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

I N/A

~

9. Power Level To W1uch Restricted,I.' Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A TMMen44 Yr.-to-Det e-Cumulatne

11. Houp in Reporting Period 720 6,551 16,055
12. Nu.nber Of Hours Reactor Was Cr?ical 1,533.7 9,777,5
13. Reactor Reserve Shutdown Hours 72.4 1,097.9
14. Hours Generator On-Line 1,510.8 9,596.5
15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 3,556,347.8 24,379,595.8
18. Net Electrical Energy Generated (MWH)..

1,137,794 7.811,992

17. Gross Electrical Energy Generated (MWH) 1,074.286 7.390.1I2
19. Unit Service Factor 23.I So.8
20. Unit Availability Factor 23.1 59.8
21. Unit Capacity Fac:.sr (Using MDC Net) 19.8 55.5
22. Unit Capacity Factor (Using DER Net) 19.L 55.5
23. Unit Forced Outage Rate 5. 9_

7.6

24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1:

Refueline Outare and anchor bolt testine in oroeress.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

October 26. 1970

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 8/6/77 8/4/77 INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77

  • The Nameplate Rating / Design Electrical Rating will be used for the Maximum Dependable capacity until an accurate value can be determined from operating experience, lib 4 315""

AVLRAGE D ALLY UNIT POWER LEVEL DOCKET NO. 50-346 UNIT I DATE 10/1/79 C0\\lPLETED By W. G. Hairston, III TELEP!!ONE (205)899-5156 MONTI{

September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEi.

(MWe-Net)

(51We Net)

37 2 is _

3 19 4 20.

5 --

21

- 6 22 7 23 8 24 9 25 10 26 3 27 12

-b 28

.0,_

13 29 14

-b 30,

3 ,N -

3; q\\ s, : '

6.-

Q s'

INSTRUCTIONS On this format,hst the average daily unit piner lese! in Slwe Net for each day in the reporting month. Compute to the nearest wnole megawatt.

(0177) 6154 316

UNIT SilU! DOWNS AND POWER REDUC 110NS DOCKE T NO. 50-348 UNIT NA\\tE J. M. Fa r l ey-Un i t 1 DATE 10/1/79 COMPLETED RY W.G.

ilairston, III N REPOR T Nf ONT!! Sentombe r TELEPIIONE (205)899-5156 W

W "Q

D 5?

3 4 Ej Licensee

[ +,

En Cause & Corrective

~

o

1) ate i

3?

4 isE Event

7 Gl Action to jE 5g5 Report r EU E'

Prevent Recurrence g

U i

O 020 790901 S

720 C

1 N/A RC ZZZZZZ Continuation from August 31, 1979.

Refueling Outage in progress. Testing

[u anchor bolts is 'elaying unit startup.

Gj%3

'O h

o o

1

~

3 4

I l'iiced ltea on:

Method:

Estubit G -Instrutriens S Sh Juluf A.I nuipment l'ailure(! splain)

I-Man ual for Preparation of Data RTlaina nance or Test 2-Manual Scram.

Entry Sheets foi 1.icensee C.Reincl.ng

3. Autonotic Scram.

Event Report ILERI File (NtlRI G.

1).Regularon Rotrktion 44)ther (iixplain )

0161) i Openion fiaimng i 1.icense i semination 1 Adouin.t raine 5

G Uperational la roi (1 splam )

Estubit i. Same Source p3l77)11-01hs r (I: splain i

.