YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPOR., 79-09 FCR THE MONTH OF SEPTEMBER, 1979
^ f
(~
y i
7910160 3 4
/ *'%
OPERATING DATA REPORT
^
DOCKET NO.
50-29 DATE 701012 C051PLETED BY 4 V 9fogren TELEPHONE 617-%6-9011 X2281 0.'tiRATING STATUS
- 1. Unit Name:
Yankee Rowe Notes
- 2. Reporting Period:
Septe:aber 1979
- 3. Licensed Thermal Power (31Wt):
600 185
- 4. Nameplate Rating (Gross SIWE):
- 5. Design Electrical Rating (Net alWe):
175
- 6. Sfaximum Dependable Capacity (Gross StWe):
180 175
- 7. Sfaximum Dependable Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,If Any(Net alwe):
None
- 10. Reasons For Restrictions.If Any:
N/A
( -
This 51onth Yr..to.Date Cuanulative
- 11. Hours in Reporting Period 720 6,551
- 12. Number Of Hours Reactor Was Critical 175.37 5,808.9 136,999.8
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 175.33 5,798.11 132.'676.11
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (31WH) 101.693 3.396.176
_70.969,721.11
- 17. Gross Electrical Energy Generated (51WH) 30,689.6 1,064,644.32 21,825,592.2
- 18. Net E!ectrical Energy Generated (alWH) 28,768.65 _ 1,000,656.31 20,434,536.97
- 19. Unit Service Factor 24.4 88.5 80.2
- 20. Unit Availability Factor 24.4 88.5 80.2
- 21. Unit Capacity Factor (Using AfDC Net) 22.8 87.3 73.3 22.8 87.3 73.3
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0 2.9 1.7
- 24. Shutdowns Scheduled C er Next 6 Slonths (Type. Date,and Duration of Eacht:
- 25. If Shut Down At End Of Report Pe;iod. Estimated Date of Startup:
October-26, 1979
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COsl31ERCIAL OPERATION
{'
(9/77)
q UNITSilU1 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-29 UNIT NAhlE Yankee Rowe DATE 791012 REPORT MONTil Sept. 1979 COMPLETED fly R. M. S lostren
((
TELEPil0NE (617) 366 a011 2,
X2281 q
t 2
'3 sa 2 E
e re 5
8 m53 Li' "5 5%,
~~
Cause & Correceive
=
N"-
D' ' '-
R eS 71 2 5 a:
Event et y
- a. ]
Acg;on go c5 6 5
j@j Repor *
@G u
Prevent Itecurrence 6
4 9/8/79 S
544.67 B
1 N/A N/A N/A Plant shutdown to perform examinations per I & E Bulletins 79-2, 79-13 and 79-17.
I 2
3 4
F: Forted lleason:
Method -
Exhibit G. Instnictions S: S(hedulcil A.Eipiipment Failure (Explain)
I-Mwut for Pieparation of Data
- 11. Maintenance of Test 7 Manual Seram.
Eni:y Sheets for 1.icensee C.Itefueling 3 Automatic Scram.
Event Iterosi (Lliiti File INUltEG-D.Itegulainiy itestviction 4-Other (limplain) 01611 li Oper.itor Tsaining & License lixaminatiun I: Ailministrative 5
G Opceation.il I isur Ilimpl.iini lintuisit I Same Sonsce P8/17)
II Othes Ilimpi. sin) e
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-29 Yankee Rowe UNIT DATE 791012 COSIPLETED BY R. M. Sjogren TELEPHONE (617) 366-9011 X2281 Sf0 NTH September 1979 day AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL O!We-Net)
(51We Net) 169.6 0.0 g7 2
1Ao '
13 0.n 3
168.6 19 0.0 4
167.9 20 0.0 5
167.8 23 0.0 6
168.0 22 0.0
\\
7 167.0 23 0.0 8
70.6 24 0.0 9
0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 0.0 12 0.0 23, 0.0 g3 0.0 29 0.0 34 0.0 30 00 15 0.0 33 0.0 16 0.0 INSTRUCTIONS On this format. list the average daily unit power level in 51We Net for each day in the reporting month. Compute to the nearest whole megawatt.
Pf77) v
+
DOCKET NO.
50-29 U:H' J nkee Rowe DATE 791012 COMPLETED BY R. M. Sjogren TELEPHONE (617) 366-9011 X2281 REPORT MONTH Seotember 1979 SU'f!ARY OF OPERATING EXPERIENCES 7/7 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> a plant shutdown was begun to perform inspections per I & E Bulletins 79-02, " Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts"; 79-13, " Cracking in Feedwater System Piping"; and 79-17, " Pipe Cracks in Stagnant Borated Watt c System at PWR Plants".
7/8 At 0720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> the generator was taken off the grid.