ML19253B511

From kanterella
Jump to navigation Jump to search
Notifies That ASME Code Cases N-234 & N-235 for Automated Ultrasonic Examination Sys Will Be Used in Preservice & Inservice Insp Programs
ML19253B511
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/09/1979
From: Peoples D
COMMONWEALTH EDISON CO.
To: Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 7910160334
Download: ML19253B511 (3)


Text

Commonwealth Edison One I erst National Plaza. Chicago, tihnois Adaress Reply to: Post Office Box 767 Chicago, liknois 60690 October 9, 1979 Mr. Olan D. Parr, Chief Light Water Reactors - Branch 3 Division of Project Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Automated Ultrasonic Examination Systems ASME Code Cases N-234 and N-235 (Section XI, Division I)

LaSalle County Station Units 1 and 2 NRC Docket Nos. 50-373/374

Dear Mr. Parr:

This is to inform you of the intent on the part of Commonwealth Edison to make use of ASME Code Case N-234 and N-235 by which automated ultrasonic examination systems are relieved of the 4-hour calibration interval required by Sub-sections I-3100, I-4230 or T-432.1.2 but for which a 12-hour calibration interval is required which need not be coincident with a change of operator personnel. These Code Cases will facilitate the use of such automated systems in the pre-service and in-service inspection programs at LaSalle County Station.

A copy of the text of each of these cases is attached for your information.

These Code Cases have been reviewed and approved by the ASME Council and it is hoped will be acknowledged by the .

Staff as acceptable for immediate use. Please advise us as soon as possible if you have any questions on these Code Cases.

Should any questions exist, we request that a meeting be scheduled immediately so that we may address and resolve your concerns. In that re 'rd, we would greatly appreciate your in-dicating within two (2) weeks of receipt of this letter whether additional information will be required in support of this request.

Implementation of these Code Cases will greatly facilitate the ongoing LaSalle County Unit 1 Pre-Service Program.

One (1) signed original and thirty-nine (39) copies of this letter and attachments are enclosed for your use.

Very truly yours,

}/]il g2

- a y D, L. Peop es Nuclear Licensing Administrator LOD:mae atts.

s.. 77 aa 7010160 331/

ISI 78 - 3 (a)

Motion (a)

Code Case N-234 Time Between Ultrasonic Calibration Checks Sec tion XI, Division _1 INQUIRY: In performing ultrasonic examinations in accordance with Appendix I or Appendix III of Section XI, Division 1, when using automated ultrasonic examina-tion systems, may the time period between calibration checks required by I-4230 or III-3330 be extended to be coincident with change in operator personnel but not to be longer than every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />?

REPLY: It is the opinion of the Committee that, when per-forming ultrasonic examinations in accordance with either Appendix I or Appendix III of Section XI, Division 1, if automated ultrasonic examination systems are used, the time period between calibration checks required by I-4230 or III-3330 may be extended to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and need not be coincident with a change of operator personnel,

~ -

i n b a s [f ,

ISI 78 - 3(b)

Motion b Code Case N-235 Ultrasonic Calibration Checks Per Section V Section ::I, Division 1 INQUIRY: In performing Section XI ultrasonic examinations in accordance with Article 4 of Section V, when using automated ultrasonic examination systems, may the time period between calibration checks required by T-432.1.2 be extended to be coincident with change in operator personnel but not to be longer than every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

REPLY: It is the opinion of the Committee that, when performing Section XI ultrasonic examinations in accordance with Article 4 of Section V, if automated ultrasonic examination systems are used, the time period between calibration checks required by T-432.1.2 may be extended to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and need not be coincident with a change in operator personnel.

<' ^;

I' [/