Forwards LER 79-057/01T-0
Date released: 09/24/2019 Download: ML19253B361


LER 79-057/01T-0:on 790927,as Result of Pipe Stress Reanalysis,Plant Was Notified That Five Pipe Supports Were Considered Inoperable.Caused by Piping Overstress.All Mods & Analyses Performed within Tech Spec Framework