ML19253B054

From kanterella
Jump to navigation Jump to search
Forwards LER 79-030/03L-0
Date released: 09/24/2019 Download: ML19253B054


LER 79-030/03L-0:on 790805,control Element Assemblies 6,7, 49,51 & 53 Failed to Initiate Motion Inhibit Function. Caused by Drifting of Motion Inhibit Setpoint Voltage Levels.Setpoints Will Be Reduced
ML19253B057
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/31/1979
From: Heibel R, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B057 (1)
Forwards LER 79-030/03L-0
ML19253B053
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/31/1979
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B053 (1)