ML19253B014

From kanterella
Jump to navigation Jump to search
Forwards LER 79-031/03L-0
Date released: 09/24/2019 Download: ML19253B014


LER 79-031/03L-0:on 790807,during Testing of Emergency Diesel Generator Sequencing Circuit,First Loading Sequence Was Shorter than Required.Caused by Starting Point Being Off Zero.Sequencer Cycled & Adjusted to within Spec Limits
ML19253B017
Person / Time
Site: Beaver Valley
Issue date: 09/07/1979
From: Werling J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B017 (1)
Forwards LER 79-031/03L-0
ML19253B013
Person / Time
Site: Beaver Valley
Issue date: 09/07/1979
From: Werling J
DUQUESNE LIGHT CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19253B013 (2)