ML19253A994

From kanterella
Jump to navigation Jump to search
Responds to FOIA Request for CP Info,Correspondence Regarding Backfitting & Info Concerning Addition,Elimination or Mod of Sys.Forwards Requested Records
ML19253A994
Person / Time
Site: Perry, 05000550  
Issue date: 09/11/1979
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Gabriel H
AFFILIATION NOT ASSIGNED, NORTON & CRISTENSEN
Shared Package
ML19253A995 List:
References
FOIA-79-353 NUDOCS 7909140322
Download: ML19253A994 (2)


Text

"

()

r o

J f

I h

f,, f {

pm Mcg

,,f

+

UNITED STATES fik i,,D I i ', ~ / [

y g

NUCLEAR REGULATORY COMMISS!ON

.)

)

nC WASHINGTON, D C. 20555 g,....c /

Docket flos. 50-440 SEP 111979 and 50-441 Harold J. Gabriel, Esquire Norton & Christensen Attorneys and tounsellors at Law Goshen Executi,e Building P. O. Box 308 IN RESPONSE REFER Goshen, NY 10924 TO F0IA-79-353

Dear Mr. Gabriel:

This is in response to your letter dated August 21, 1979 in which you requested, pursuant to the Freedom of Information Act, access to docu-ments concerning the Perry Nuclear Power Plant, Perry, Ohio.

The documents listed in Avidix A are enclosed.

In a September 10, 1979 telephone conversation, Ms. Ellen Whitlow of my staff advised you that the cost of reproducing documents is ten cents

($0.10) per page, as specified in 10 CFR 9.14(b).

Accordingly, the cost of reproducing the enclosed 121 pages is $12.10.

Please send a check made payable to the U.S. Nuclear Regulatory Commission in the amount of $12.10, along with a copy of this letter, to the Director, Division of Rules and Records, Room MNBB 4210, U.S. Nuclear Regulatory Commission, Washington. DC 20555.

For your information, dccument 6 of Appendix A refers to a report prepared by Gilbert Associates, "Embedment Evaluation Report, No. 2001" dated 12/1/78.

NRC staff has been unable to locate this report in their files and suggests that you write directly to Gilbert Associates if you desire a copy.

NRC staff has also informed me that there are no documents regarding items 3, 4, and 5 of your request: the revocation or suspension of the construction permit; the backfitting of the Perry Plant; and the addition, elimination, or modification of structures, systems, or components at the Perry Plant.

If you have any further questions regarding the Perry Plant, please contact the project manager, Mr. Carl Stahle, on (301) 492-8474.

Sincere

(

J. M. Felton, Director Division of Rules and Records rggg Office of Admin 1 station

Enclosures:

As stated 7909140 8

F01A-79-353 4

APPENDIX A

]3

.1._

lb)

.'f/)'LL) (,,Y kl fl' /)f sL'; _b

)

Letter 6/13/79 G. Fiorelli to Cleveland Electric Illuminating Co.

1.

t etter 5/29/79 D. Davidson to' J. Keppler 2.

~

Letter 3/1/79, G.. Fiorelli to C1evela'd Electric Illuminating Co.

n 3.

4.

Letter 2/12/79 D. Davidson to J. Keppler 5.

Letter 1/11/79 R.11eishman tc Cleveland Electric Illuminating Co.

6.

Letter 12/1/78 D. Davidson to J. Keppler 7.

Letter 8/17/78 R. !!eishman to Cleveland Electric Illuminating Co.

8.

Letter 8/8/78 D. Davidson to J. Keppler 9.

Letter 8/7/78 D. Davidson to J. Keppler 10.

Letter 7/12/78 R. lieishman to Cleveland Electric Illuminating Co.

11.

Letter 5/15/78 D. Davidson to R. lleishman 12.

Letter 3/17/78 R. licishman to Cleveland Electric Iliuminating Co.

13.

Letter 3/6/78 D. Davidson to J. Keppler

~

14.

Letter 11/2/77 D. Davidson to J. Keppler 15.

Letter 9/15/77 R. Ileishman to Cleveland Electric Illuminating Co.

16.

Letter S/31/77 D. Davidson to J. Keppler 17.

Letter 8/3/77 R.11eishman to Cleveland Electric Illuminating Co.

18.

Letter 7/29/77 D. Davidson to J. Keppler 19.

Letter 9/16/76 E. Jordan to Cleveland Electric _ Illuminating Co.

20. Letter 9/2/76 R. Coan to J.'Keppler 21.

Letter.7/19/76 R. Coan to E. Volgenau 22.

Letter 11/5/75 A. Kaplan to D. Knuth 23.

Letter 5/3/77 S. Varga to D. Davidson w/ attachment Construction Permits, CPPR-148 and CPPR-149 343$.1.3

.